Correction of prediction model output for structural design and risk-based inspection and maintenance planning

被引:5
作者
Hifi, Nabile [1 ]
Barltrop, Nigel [1 ]
机构
[1] Univ Strathclyde, Dept Naval Architecture Ocean & Marine Engn, Glasgow, Lanark, Scotland
关键词
Prediction model; Reliability; Calibration; Bias; Structure; Ship; FATIGUE RELIABILITY; SYSTEM RELIABILITY; WELDED-JOINTS; CORROSION;
D O I
10.1016/j.oceaneng.2015.01.001
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
This paper presents a new methodology to calibrate structural reliability models output. The methodology combines data from experience and prediction models to correct the structural reliability models. The paper gives an overview of the techniques used for model calibrations, summarises the methodology in an overall discussion, and proposes data processing to sanitise sensitive information. The proposed methodology is inherently adaptable and can be applied to many other fields that require cost effective maintenance, as well as providing data for calibrating methods and codes. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:114 / 125
页数:12
相关论文
共 50 条
[41]   Risk-based resource optimization for transmission system maintenance [J].
Jiang, Yong ;
McCalley, James D. ;
Van Voorhis, Tim .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2006, 21 (03) :1191-1200
[42]   An approach to risk-based maintenance strategy of a printing press [J].
Kar, Avijit ;
Pal, Arun Kiran .
JOURNAL OF PRINT AND MEDIA TECHNOLOGY RESEARCH, 2019, 8 (03) :155-165
[43]   Risk-based methodology to assess bridge condition based on visual inspection [J].
Bertola, Numa J. ;
Bruehwiler, Eugen .
STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2023, 19 (04) :575-588
[44]   Improving the availability and lengthening the life of power unit elements through the use of risk-based maintenance planning [J].
Rusin, Andrzej ;
Wojaczek, Adam .
ENERGY, 2019, 180 :28-35
[45]   Computational framework for risk-based planning of inspections, maintenance and condition monitoring using discrete Bayesian networks [J].
Nielsen, Jannie Sonderkaer ;
Sorensen, John Dalsgaard .
STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2018, 14 (08) :1082-1094
[46]   The use of risk-based assessment techniques to optimise inspection regimes [J].
Bernett, GR ;
Middleton, ML ;
Topalis, P .
HAZARDS XIV: COST EFFECTIVE SAFETY, 1998, (144) :503-513
[47]   Risk-based inspection (RBI) of a gas pressure reduction station [J].
Babaeian, A. ;
Eslami, A. ;
Ashrafizadeh, F. ;
Golozar, M. A. ;
Samadzadeh, M. ;
Abbasian, F. .
JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2023, 84
[48]   Risk-based inspection planning applied to 14 steel jacket structures in Bass Strait, Australia - Case study [J].
Barton, AD ;
Descamps, B .
PROCEEDINGS OF THE 10TH (2000) INTERNATIONAL OFFSHORE AND POLAR ENGINEERING CONFERENCE, VOL IV, 2000, :364-371
[49]   Risk-based maintenance scheduling using monitoring data for moored floating breakwaters [J].
Diamantoulaki, Ioanna ;
Angelides, Demos C. .
STRUCTURAL SAFETY, 2013, 41 :107-118
[50]   Fuzzy Reliability and Risk-Based Maintenance of Buried Pipelines Using Multiobjective Optimization [J].
Ebenuwa, Andrew Utomi ;
Tee, Kong Fah .
JOURNAL OF INFRASTRUCTURE SYSTEMS, 2020, 26 (02)