Risk of commodity price, production cost and time to build in resource economics

被引:8
作者
Zhang, Kuangyuan [1 ]
Olawoyin, Richard [2 ]
Nieto, Antonio [1 ]
Kleit, Andrew N. [1 ]
机构
[1] Penn State Univ, University Pk, PA 16802 USA
[2] Oakland Univ, Rochester, MI 48309 USA
关键词
Option pricing; Commodity price; Risk management; Resource assessment; Time to build; PIT MINING OPERATIONS; CUTOFF GRADE POLICY; REAL OPTIONS; INVESTMENT DECISIONS; SOCIAL LICENSE; METAL PRICES; MINE; UNCERTAINTY; VALUATION; SIMULATION;
D O I
10.1007/s10668-017-0003-0
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Real option theory has been extensively applied to natural resource extraction modeling and risk management, which proves to be a significantly more powerful method than the traditional ones such as discounted cash flows. This research attempts to extend a proposed real option model based on optimized price threshold strategy for gold mining operations. Besides exploring the risk from commodity price, the research also examines the effects of a declining stochastic production costs, due to technology innovation in the long term. The extended real option model further examines how the time to build a gold mine can impact the optimized price threshold strategy. Sensitivity analysis and numerical evidence show that, (1) innovation in mining technology will boost the mine's profitability and also shift the optimized price threshold; (2) mining operators can hedge a significant level of risk by treating time to build properly. Further discussions are provided on mining investment strategy and policy implication for resource extraction.
引用
收藏
页码:2521 / 2544
页数:24
相关论文
共 85 条
[11]   Optimal policy and consumption smoothing effects in the time-to-build AK model [J].
Bambi, M. ;
Fabbri, G. ;
Gozzi, F. .
ECONOMIC THEORY, 2012, 50 (03) :635-669
[12]  
Barbier E.B., 2013, Economics, Natural-Resource Scarcity and Development (Routledge Revivals): Conventional and Alternative Views
[13]  
Barnett H.J, 2013, SCARCITY GROWTH EC N
[14]   On the economic determinants of the gold-inflation relation [J].
Batten, Jonathan A. ;
Ciner, Cetin ;
Lucey, Brian M. .
RESOURCES POLICY, 2014, 41 :101-108
[15]   The gold price in times of crisis [J].
Bialkowski, Jedrzej ;
Bohl, Martin T. ;
Stephan, Patrick M. ;
Wisniewski, Tomasz P. .
INTERNATIONAL REVIEW OF FINANCIAL ANALYSIS, 2015, 41 :329-339
[16]   PRICING OF OPTIONS AND CORPORATE LIABILITIES [J].
BLACK, F ;
SCHOLES, M .
JOURNAL OF POLITICAL ECONOMY, 1973, 81 (03) :637-654
[17]  
Blais Vincent, 2005, USING REAL OPTIONS I
[18]  
Brander JA, 1998, AM ECON REV, V88, P119
[19]   EVALUATING NATURAL-RESOURCE INVESTMENTS [J].
BRENNAN, MJ ;
SCHWARTZ, ES .
JOURNAL OF BUSINESS, 1985, 58 (02) :135-157
[20]   Implementing a stochastic model for oil futures prices [J].
Cortazar, G ;
Schwartz, ES .
ENERGY ECONOMICS, 2003, 25 (03) :215-238