Risk of commodity price, production cost and time to build in resource economics

被引:8
作者
Zhang, Kuangyuan [1 ]
Olawoyin, Richard [2 ]
Nieto, Antonio [1 ]
Kleit, Andrew N. [1 ]
机构
[1] Penn State Univ, University Pk, PA 16802 USA
[2] Oakland Univ, Rochester, MI 48309 USA
关键词
Option pricing; Commodity price; Risk management; Resource assessment; Time to build; PIT MINING OPERATIONS; CUTOFF GRADE POLICY; REAL OPTIONS; INVESTMENT DECISIONS; SOCIAL LICENSE; METAL PRICES; MINE; UNCERTAINTY; VALUATION; SIMULATION;
D O I
10.1007/s10668-017-0003-0
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Real option theory has been extensively applied to natural resource extraction modeling and risk management, which proves to be a significantly more powerful method than the traditional ones such as discounted cash flows. This research attempts to extend a proposed real option model based on optimized price threshold strategy for gold mining operations. Besides exploring the risk from commodity price, the research also examines the effects of a declining stochastic production costs, due to technology innovation in the long term. The extended real option model further examines how the time to build a gold mine can impact the optimized price threshold strategy. Sensitivity analysis and numerical evidence show that, (1) innovation in mining technology will boost the mine's profitability and also shift the optimized price threshold; (2) mining operators can hedge a significant level of risk by treating time to build properly. Further discussions are provided on mining investment strategy and policy implication for resource extraction.
引用
收藏
页码:2521 / 2544
页数:24
相关论文
共 85 条
  • [1] Valuing real capital investments using the least-squares Monte Carlo method
    Abdel Sabour, Sabry A.
    Poulin, Richard
    [J]. Engineering Economist, 2006, 51 (02) : 141 - 160
  • [2] Real option in action: An example of flexible decision making at a mine operational level
    Ajak, Ajak Duany
    Topal, Erkan
    [J]. RESOURCES POLICY, 2015, 45 : 109 - 120
  • [3] Akbari A., 2009, MINING SCI TECHNOLOG, V19, P709, DOI DOI 10.1016/S1674-5264(09)60130-7
  • [4] [Anonymous], 2016, Resource economics: an economic approach to natural resource and environmental policy
  • [5] Asad M. W. A., 2005, International Journal of Surface Mining, Reclamation and Environment, V19, P176, DOI 10.1080/13895260500258661
  • [6] Optimum cut-off grade policy for open pit mining operations through net present value algorithm considering metal price and cost escalation
    Asad, M. W. A.
    [J]. ENGINEERING COMPUTATIONS, 2007, 24 (7-8) : 723 - 736
  • [7] A review of cut-off grade policy models for open pit mining operations
    Asad, Mohammad Waqar Ali
    Qureshi, Muhammad Asim
    Jang, Hyongdoo
    [J]. RESOURCES POLICY, 2016, 49 : 142 - 152
  • [8] Optimal production scale of open pit mining operations with uncertain metal supply and long-term stockpiles
    Asad, Mohammad Waqar Ali
    Dimitrakopoulos, Roussos
    [J]. RESOURCES POLICY, 2012, 37 (01) : 81 - 89
  • [9] Ataei M., 2004, INT J SURF MIN RECLA, V18, P60, DOI [10.1076/ijsm.18.1.60.23543, DOI 10.1076/IJSM.18.1.60.23543]
  • [10] An uncertainty based multi-criteria ranking system for open pit mining cut-off grade strategy selection
    Azimi, Yousuf
    Osanloo, Morteza
    Esfahanipour, Akbar
    [J]. RESOURCES POLICY, 2013, 38 (02) : 212 - 223