Design of exponential control charts based on average time to signal using a sequential sampling scheme

被引:46
作者
Yang, Jun [1 ]
Yu, Huan [1 ]
Cheng, Yuan [2 ]
Xie, Min [2 ]
机构
[1] Beihang Univ, Sch Reliabil & Syst Engn, Beijing 100191, Peoples R China
[2] City Univ Hong Kong, Dept Syst Engn & Engn Management, Hong Kong, Hong Kong, Peoples R China
关键词
Gamma distribution; average time to signal (ATS); unbiased control chart; time between events; sequential sampling; ESTIMATED CONTROL LIMITS; I CONTROL CHARTS; EVENTS; CUSUM; PERFORMANCE; PARAMETERS; INTERVALS; COUNT;
D O I
10.1080/00207543.2014.974848
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Exponential charts based on time-between-events (TBE) data are widely investigated and applied in various fields. The average time to signal (ATS) is used instead of the average run length to evaluate the performance of TBE charts, since the ATS involves both the number and the time of samples inspected until a signal occurs. An ATS-unbiased exponential control chart is proposed when the in-control parameter is known. Considering the need in practice to start monitoring a production process as soon as possible, a sequential sampling scheme is adopted and the in-control parameter is estimated by an unbiased and consistent estimator. Some specific guidelines to stop updating control limits are obtained from the relationship between the phase I sample size and the actual false alarm rate. Finally, two real examples are given to illustrate the implementation and efficiency of the proposed method.
引用
收藏
页码:2131 / 2145
页数:15
相关论文
共 34 条
[11]  
Gan FF, 1998, J QUAL TECHNOL, V30, P55
[12]   A combined synthetic and np scheme for detecting increases in fraction nonconforming [J].
Haridy, Salah ;
Wu, Zhang ;
Khoo, Michael B. C. ;
Yu, Fong-Jung .
COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 62 (04) :979-988
[13]   INTERVALS BETWEEN COAL-MINING DISASTERS [J].
JARRETT, RG .
BIOMETRIKA, 1979, 66 (01) :191-193
[14]   Phase I control charts for times between events [J].
Jones, LA ;
Champ, CW .
QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2002, 18 (06) :479-488
[15]   Optimal designs of the double sampling (X)over-bar chart with estimated parameters [J].
Khoo, Michael B. C. ;
Teoh, W. L. ;
Castagliola, Philippe ;
Lee, M. H. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 144 (01) :345-357
[16]   A Study of Time-between-Events Control Chart for the Monitoring of Regularly Maintained Systems [J].
Khoo, Michael B. C. ;
Xie, M. .
QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2009, 25 (07) :805-819
[17]  
Liu J.Y., 2006, QUAL TECHNOL QUANT M, V3, P347, DOI DOI 10.1080/16843703.2006.11673120
[18]   COUNTED DATA CUSUMS [J].
LUCAS, JM .
TECHNOMETRICS, 1985, 27 (02) :129-144
[19]   CUSUM ANALYSES OF TIME-INTERVAL DATA FOR ONLINE RADIATION MONITORING [J].
Luo, Peng ;
DeVol, Timothy A. ;
Sharp, Julia L. .
HEALTH PHYSICS, 2012, 102 (06) :637-645
[20]   Properties of the Exponential EWMA Chart with Parameter Estimation [J].
Ozsan, Guney ;
Testik, Murat Caner ;
Weiss, Christian H. .
QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2010, 26 (06) :555-569