Design and practices of Tianshengqiao-1 concrete faced rockfill dam
被引:0
作者:
Zhang, ZL
论文数: 0引用数: 0
h-index: 0
机构:
State Power Corp China, Design & Res Inst, Kunming Survey, Kunming 650051, Yunnan, Peoples R ChinaState Power Corp China, Design & Res Inst, Kunming Survey, Kunming 650051, Yunnan, Peoples R China
Zhang, ZL
[1
]
Feng, YL
论文数: 0引用数: 0
h-index: 0
机构:
State Power Corp China, Design & Res Inst, Kunming Survey, Kunming 650051, Yunnan, Peoples R ChinaState Power Corp China, Design & Res Inst, Kunming Survey, Kunming 650051, Yunnan, Peoples R China
Feng, YL
[1
]
Wang, YL
论文数: 0引用数: 0
h-index: 0
机构:
State Power Corp China, Design & Res Inst, Kunming Survey, Kunming 650051, Yunnan, Peoples R ChinaState Power Corp China, Design & Res Inst, Kunming Survey, Kunming 650051, Yunnan, Peoples R China
Wang, YL
[1
]
机构:
[1] State Power Corp China, Design & Res Inst, Kunming Survey, Kunming 650051, Yunnan, Peoples R China
来源:
PROCEEDINGS OF THE CHINA ASSOCIATION FOR SCIENCE AND TECHNOLOGY, VOL 1, NO 1
|
2004年
Tianshengqiao-1 concrete faced rockfill dam was completed in 2000 and has been operating normally for 4 years. Instrument data show that the dam is safe. This paper generalizes the design, construction, and operating experiences and probes into the design experiences of high concrete faced rockfill dam. It is found that these experiences modify, supplement and improve the traditional design concept.