Study of various models for estimation of penetration rate of hard rock TBMs

被引:153
作者
Farrokh, Ebrahim [1 ]
Rostami, Jamal [1 ]
Laughton, Chris [2 ]
机构
[1] Penn State Univ, EME Dept, University Pk, PA 16802 USA
[2] Laughton Associates, Austin, TX USA
基金
美国国家科学基金会;
关键词
Penetration rate; Penetration rate per revolution; Specific penetration; Field penetration rate; Specific excavation rate; GHOMROUD TUNNEL; PERFORMANCE PREDICTION; CONVERGENCE; PARAMETERS;
D O I
10.1016/j.tust.2012.02.012
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Various approaches for predicting penetration rate of hard rock tunnel boring machines (TBMs) have been studied by researchers since the early stages of TBM application in the 1950s. These studies resulted in the development of several penetration prediction models. For evaluation and validation of a model, it is important to test its predictive capability on new projects. A model should include parameters for machine specifications and ground conditions. The model validation process can reveal problems that an existing model may have in providing an accurate estimate for a given combination of specifications and conditions. This paper offers a brief review and discusses the capabilities of some of the more commonly used TBM performance prediction models. To evaluate the accuracy of these models, the predicted rates are compared with recorded TBM penetration rates in a database of recently completed tunnels. Comparison between predicted and recorded rates indicates that most of the existing models tend to overestimate TBM performance. This comparison highlights the on-going difficulties the industry continues to experience in estimating penetration rate. Even the use of normalized penetration rate indices has not been able to provide higher accuracy expected in related predictions. This paper discusses the development of new models to support an improved level of predictive accuracy in penetration rate estimating. These models are based on the analysis of a comprehensive database of more than 300 TBM projects records. Analyses of performance information within this database provided for the development of simpler models that are focused on quantifying the influence of primary factors, such as tunnel diameter, UCS, RPM, and rock type. These new models are introduced to provide alternative ways of penetration prediction. These models are especially useful at the planning stage of a tunneling project where TBMs can be used. These models also serve to provide secondary checks for other more in-depth analyses of TBM performance for an initial assessment of required boring time (inverse of penetration rate), and an estimate of utilization rate in an activity-based TBM model. (c) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:110 / 123
页数:14
相关论文
共 55 条
[11]   Evaluation of ground convergence and squeezing potential in the TBM driven Ghomroud tunnel project [J].
Farrokh, E ;
Mortazavi, A ;
Shamsi, G .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2006, 21 (05) :504-510
[12]  
FARROKH E, 2007, RELATIONSHIP TUNNEL, P1094
[13]   Correlation of tunnel convergence with TBM operational parameters and chip size in the Ghomroud tunnel, Iran [J].
Farrokh, Ebrahim ;
Rostami, Jamal .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2008, 23 (06) :700-710
[14]   Analysis of Unit Supporting Time and Support Installation Time for Open TBMs [J].
Farrokh, Ebrahim ;
Rostami, Jamal ;
Laughton, Chris .
ROCK MECHANICS AND ROCK ENGINEERING, 2011, 44 (04) :431-445
[15]   Effect of adverse geological condition on TBM operation in Ghomroud tunnel conveyance project [J].
Farrokh, Ebrahim ;
Rostami, Jamal .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2009, 24 (04) :436-446
[16]  
Frenzel Ch., 2008, GEOMECHANIK TUNNELBA, V1, P55, DOI [10.1002/geot.200800006, DOI 10.1002/GEOT.200800006]
[17]  
Gong, 2005, THESIS NANYANG TECHN
[18]  
Graham P.C., 1976, EXPLORATION ROCK ENG, P173
[19]  
Grima MA, 1999, INT J ROCK MECH MIN, V36, P339
[20]  
Grima MA, 2000, TUNN UNDERGR SP TECH, V15, P259