Research on the Unit Black-Start Strategy Considering Recovery Path and Start Sequence

被引:2
作者
Zhao, Jie [1 ]
Liang, Yilin [1 ]
Fang, Yudi [2 ]
Weng, Yixuan [3 ]
Ma, Weizhe [3 ]
Zhang, Huaixun [1 ]
Zhang, Yiyang [1 ]
机构
[1] Wuhan Univ, Sch Elect Engn & Automat, Wuhan 430072, Peoples R China
[2] State Grid Fujian Elect Power Econ & Tech Res Ins, Fuzhou 350007, Peoples R China
[3] Shenzhen Power Co Ltd, Shenzhen 518001, Peoples R China
关键词
units recovery path; start-up sequence; shortest path; recovery success rate; black start; RESTORATION;
D O I
10.3390/su142013057
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Large-scale power outage events bring serious economic losses to national and social development and cause bad impacts, and the reasonable formulation of a unit black-start strategy is the basis of power outage recovery. Firstly, the Dijkstra shortest path algorithm is used to search for the optimal recovery path of the unit to be started after a major blackout occurs, and secondly, a comprehensive index of the unit start sequence considering the unit characteristics and unit distance is defined to guide the unit start sequence formulation by combining the unit capacity, climbing rate, start power, and other characteristics with the recovery time and capacitance value of the recovery path. Finally, based on the unit start sequence and optimal recovery path, and taking into account the unit start constraints, a complete unit black-start strategy is proposed, and the effectiveness of this strategy is verified by IEEE30 node system simulation. The results show that the proposed unit black-start strategy can reduce the unit recovery time and improve the recovery success rate.
引用
收藏
页数:13
相关论文
共 17 条
[1]  
[安学民 An Xuemin], 2021, [中国电机工程学报, Proceedings of the Chinese Society of Electrical Engineering], V41, P3407
[2]  
[冯丽 Feng Li], 2016, [中国电机工程学报, Proceedings of the Chinese Society of Electrical Engineering], V36, P4904
[3]  
Gan L., 2016, THEORY PRACTICE RES
[4]  
Han Zhong-hui, 2009, Proceedings of the CSEE, V29, P21
[5]   Computation of Milestones for Decision Support During System Restoration [J].
Hou, Yunhe ;
Liu, Chen-Ching ;
Sun, Kai ;
Zhang, Pei ;
Liu, Shanshan ;
Mizumura, Dean .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2011, 26 (03) :1399-1409
[6]  
Hu J., 2011, POWER SYST TECHNOL, V35, P66
[7]  
[林伟芳 Lin Weifang], 2020, [中国电机工程学报, Proceedings of the Chinese Society of Electrical Engineering], V40, P2835
[8]  
Liu C.-R., 2004, AUTOM ELECT POWER SY, V28, P1
[9]  
[刘皓明 Liu Haoming], 2013, [电力系统自动化, Automation of Electric Power Systems], V37, P23
[10]  
[刘翔宇 Liu Xiangyu], 2016, [电力系统保护与控制, Power System Protection and Control], V44, P24