Logistics planning under uncertainty for disposition of radioactive wastes

被引:13
作者
List, GF
Wood, B
Turnquist, MA
Nozick, LK
Jones, DA
Lawton, CR
机构
[1] Cornell Univ, Sch Civil & Environm Engn, Ithaca, NY 14853 USA
[2] Rensselaer Polytech Inst, Dept Civil Engn, Troy, NY 12180 USA
[3] Sandia Natl Labs, Albuquerque, NM 87185 USA
关键词
D O I
10.1016/j.cor.2004.07.017
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The US Department of Energy (DOE) faces an enormous environmental remediation challenge involving highly radioactive wastes at former weapons production facilities. The purpose of this analysis is to focus on equipment acquisition and fleet sizing issues related to transportation of wastes from remediation sites to disposal sites. Planning for the transportation of these wastes must be done with recognition of important uncertainties related to overall quantities of waste to be moved, the rate at which the wastes will be prepared for transport, and the certification of suitable transportation containers for use in the effort. However, deadlines for completion of the effort have already been set by the political process, without much regard for these uncertainties. To address this fleet sizing problem, we have created a robust optimization model that focuses on equipment investment decisions. Through this robust optimization, we illustrate how modeling can be used to explore the effects of uncertainty on the equipment acquisition strategy. The disposition of radioactive wastes from DOE sites is an important illustration of a category of problems where equipment investments must be made under conditions of considerable uncertainty. The methodology illustrated in this paper can be applied to this general class of problems. (c) 2004 Elsevier Ltd. All rights reserved.
引用
收藏
页码:701 / 723
页数:23
相关论文
共 23 条
[1]   On the coherence of expected shortfall [J].
Acerbi, C ;
Tasche, D .
JOURNAL OF BANKING & FINANCE, 2002, 26 (07) :1487-1503
[2]  
Acerbi C., 2002, EC NOTES BANCA MONTE, V31, P379, DOI [10.1111/1468-0300.00091, DOI 10.1111/1468-0300.00091]
[3]   A MODEL FOR FLEET SIZING AND VEHICLE ALLOCATION [J].
BEAUJON, GJ ;
TURNQUIST, MA .
TRANSPORTATION SCIENCE, 1991, 25 (01) :19-45
[4]  
Birge J. R., 1997, INTRO STOCHASTIC PRO
[5]   Models and algorithms for distribution problems with uncertain demands [J].
Cheung, RKM ;
Powell, WB .
TRANSPORTATION SCIENCE, 1996, 30 (01) :43-59
[6]   DYNAMIC AND STOCHASTIC-MODELS FOR THE ALLOCATION OF EMPTY CONTAINERS [J].
CRAINIC, TG ;
GENDREAU, M ;
DEJAX, P .
OPERATIONS RESEARCH, 1993, 41 (01) :102-126
[7]   Fleet sizing and empty equipment redistribution for center-terminal transportation networks [J].
Du, YF ;
Hall, R .
MANAGEMENT SCIENCE, 1997, 43 (02) :145-157
[8]  
Erkut E, 1995, FACILITY LOCATION SU
[9]   A SUCCESSIVE LINEAR-APPROXIMATION PROCEDURE FOR STOCHASTIC, DYNAMIC VEHICLE ALLOCATION PROBLEMS [J].
FRANTZESKAKIS, LF ;
POWELL, WB .
TRANSPORTATION SCIENCE, 1990, 24 (01) :40-57
[10]   Stochastic freight flow patterns: implications for fleet optimization [J].
Hall, RW .
TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 1999, 33 (06) :449-465