共 87 条
[1]
Abd El-Karim Mohamed Sayed Bassiony Ahmed, 2017, HBRC Journal, V13, P202, DOI 10.1016/j.hbrcj.2015.05.001
[2]
RISK ASSESSMENT OF FIRST OVERSEAS MASS RAPID TRANSIT PROJECT: PROMULGATING INTERPRETIVE QUALITATIVE PARADIGM FOR CHINA PAKISTAN CONSTRUCTION CONCESSION
[J].
INTERNATIONAL TRANSACTION JOURNAL OF ENGINEERING MANAGEMENT & APPLIED SCIENCES & TECHNOLOGIES,
2018, 9 (04)
:253-269
[3]
Delay and Cost Overrun in Infrastructure Projects in Jordan
[J].
7TH INTERNATIONAL CONFERENCE ON ENGINEERING, PROJECT, AND PRODUCTION MANAGEMENT,
2017, 182
:18-24
[4]
Al-Subhi Al-Harbi K. M., 2001, International Journal of Project Management, V19, P19, DOI 10.1016/S0263-7863(99)00038-1
[6]
Cost Estimation Methods for Transport Infrastructure: A Systematic Literature Review
[J].
CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017,
2017, 196
:270-277
[7]
Bertelsen S., 2003, 11 ANN C INT GROUP L, P1