共 87 条
- [1] Abd El-Karim Mohamed Sayed Bassiony Ahmed, 2017, HBRC Journal, V13, P202, DOI 10.1016/j.hbrcj.2015.05.001
- [2] RISK ASSESSMENT OF FIRST OVERSEAS MASS RAPID TRANSIT PROJECT: PROMULGATING INTERPRETIVE QUALITATIVE PARADIGM FOR CHINA PAKISTAN CONSTRUCTION CONCESSION [J]. INTERNATIONAL TRANSACTION JOURNAL OF ENGINEERING MANAGEMENT & APPLIED SCIENCES & TECHNOLOGIES, 2018, 9 (04): : 253 - 269
- [3] Delay and Cost Overrun in Infrastructure Projects in Jordan [J]. 7TH INTERNATIONAL CONFERENCE ON ENGINEERING, PROJECT, AND PRODUCTION MANAGEMENT, 2017, 182 : 18 - 24
- [4] Al-Subhi Al-Harbi K. M., 2001, International Journal of Project Management, V19, P19, DOI 10.1016/S0263-7863(99)00038-1
- [6] Cost Estimation Methods for Transport Infrastructure: A Systematic Literature Review [J]. CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 270 - 277
- [7] Bertelsen S., 2003, 11 ANN C INT GROUP L, P1