Managing Uncertainty in Geological Engineering Models for Open-Pit Feasibility

被引:0
|
作者
Munro, Rosalind [1 ]
Keaton, Jeffrey R. [1 ]
机构
[1] AMEC Amer Inc, Los Angeles, CA 90040 USA
来源
ENGINEERING GEOLOGY FOR SOCIETY AND TERRITORY, VOL 6: APPLIED GEOLOGY FOR MAJOR ENGINEERING PROJECTS | 2015年
关键词
Confidence interval; Precision index; Reliability; Practical strength value;
D O I
10.1007/978-3-319-09060-3_63
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Open-pit mines rely on geology for economic feasibility based on mineral value and geotechnical parameters. Pit slope angles may control economics; therefore, open-pit mine design utilizes a reliability approach that specifies confidence interval, precision index, and practical strength values. The geological model for economic evaluation is developed before pit slope stability analyses are undertaken and is based on lithology and mineralization, both of which are essential for the geological engineering model. The preliminary mine plan includes a shell for the ultimate pit based on assumed pit slope configuration that includes haul-road benches. Geological engineering characterization utilizes the geological model to identify locations for geotechnical bore holes and detailed mapping of rock structure to document aspects critical for slope stability. Uncertainty is common; rock structure variability is represented from direct observation of selected outcrops and from detailed logging of rock core. Lithologies that form the ultimate pit walls are sampled for unconfined compression testing. Samples of a single lithology from different bore holes reflect formation variability. Typically, a few (3-15) samples of each lithology are tested. The desired precision index and reliability may not be met for a specified confidence interval with a limited program; these parameters cannot be determined until test-result variability is known. Geological uncertainty may be managed for open-pit mines by using practical strength values, drilling a few additional bore holes, and performing additional unconfined compression tests.
引用
收藏
页码:367 / 370
页数:4
相关论文
共 8 条
  • [1] Reliability analysis of prestressed anchors in rock slopes of open-pit mines
    Min Bao
    Zhong-hui Chen
    Ling-fei Zhang
    Zi-han Zhou
    Geng-qian Nian
    Shu-yao Shi
    Journal of Mountain Science, 2022, 19 : 2100 - 2110
  • [2] Reliability analysis of prestressed anchors in rock slopes of open-pit mines
    Bao, Min
    Chen, Zhong-hui
    Zhang, Ling-fei
    Zhou, Zi-han
    Nian, Geng-qian
    Shi, Shu-yao
    JOURNAL OF MOUNTAIN SCIENCE, 2022, 19 (07) : 2100 - 2110
  • [3] Optimization model of GNSS/pseudolites structure design for open-pit mine positioning
    Shan, Zheng-ying
    Han, Hou-zeng
    Jiang, Kun
    TRANSACTIONS OF NONFERROUS METALS SOCIETY OF CHINA, 2013, 23 (07) : 2201 - 2208
  • [4] Reliability assessment of the single motor drive of the belt conveyor on Drmno open-pit mine
    Statkic, Sasa
    Jeftenic, Ilija B.
    Bebic, Milan Z.
    Milkic, Zarko
    Jovic, Srdan
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2019, 113 : 393 - 402
  • [5] Stability Analysis of a Large Gold Mine Open-Pit Slope Using Advanced Probabilistic Method
    Pandit, Bhardwaj
    Tiwari, Gaurav
    Latha, Gali Madhavi
    Babu, G. L. Sivakumar
    ROCK MECHANICS AND ROCK ENGINEERING, 2018, 51 (07) : 2153 - 2174
  • [6] Availability-based simulation and optimization modeling framework for open-pit mine truck allocation under dynamic constraints
    Rodrigo, Mena
    Enrico, Zio
    Fredy, Kristjanpoller
    Adolfo, Arata
    INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2013, 23 (01) : 113 - 119
  • [7] An ANN-Fuzzy Cognitive Map-Based Z-Number Theory to Predict Flyrock Induced by Blasting in Open-Pit Mines
    Hosseini, Shahab
    Poormirzaee, Rashed
    Hajihassani, Mohsen
    Kalatehjari, Roohollah
    ROCK MECHANICS AND ROCK ENGINEERING, 2022, 55 (07) : 4373 - 4390
  • [8] Novel symmetric divergence based importance measures for engineering simulation models under uncertainty
    Li, Wei
    Xu, Peng
    Wang, Xueying
    He, Jialong
    Li, Hongshuang
    PROBABILISTIC ENGINEERING MECHANICS, 2025, 80