The post-combustion capture pilot plant Niederaussem - Results of the first half of the testing programme

被引:31
作者
Moser, Peter [1 ]
Schmidt, Sandra [1 ]
Sieder, Georg [2 ]
Garcia, Hugo [2 ]
Stoffregen, Torsten [3 ]
Stamatov, Veselin [3 ]
机构
[1] RWE Power AG, New Technol, Huyssenallee 2, D-45128 Essen, Germany
[2] BASF, D-67056 Ludwigshafen, Germany
[3] Linde KCA Dresden GmbH, D-01277 Dresden, Germany
来源
10TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES | 2011年 / 4卷
关键词
Post-combustion capture; amine scrubbing; MEA; advanced solvent; OPTIMIZATION;
D O I
10.1016/j.egypro.2011.01.188
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
As part of the development cooperation of RWE Power, BASF and Linde - aiming at an advanced optimised CO2-scrubbing technology for power plant application - the first post-combustion capture pilot plant in Germany was constructed and commissioned at the lignite-fired 1,000 MW Niederaussem power station in 2009. The pre-assembly of the pilot plant started in October 2008 and commissioning took place in July 2009 as planned. 7.2 t of CO2 per day can be captured from a flue gas slipstream of the power plant downstream of the desulphurisation plant (FGD). The pilot plant comprises optimised components such as a flue gas pre-scrubbing direct contact cooler unit as well as a lean liquid cooler and an interstage cooler that both allow returning the solvent at different absorber heights. During a 6-month campaign, all aspects of the optimised process configuration were tested using 30%-weight MEA as benchmark solvent and the performance of a new advanced amine-based solvent developed by BASF was trialled. This paper summarises the operational experience gained and compares some of the results obtained for MEA with those of the new amine-based solvent. (C) 2011 Published by Elsevier Ltd.
引用
收藏
页码:1310 / 1316
页数:7
相关论文
共 7 条
[1]   Simulation and optimization for power plant flue gas CO2 absorption-stripping systems [J].
Chang, H ;
Shih, CM .
SEPARATION SCIENCE AND TECHNOLOGY, 2005, 40 (04) :877-909
[2]  
GHGT10, 2010, ENERGY PROCEDI UNPUB, V2
[3]   Enabling Post Combustion Capture Optimization - The Pilot Plant Project at Niederaussem [J].
Moser, Peter ;
Schmidt, Sandra ;
Sieder, Georg ;
Garcia, Hugo ;
Ciattaglia, Ilaria ;
Klein, Harald .
GREENHOUSE GAS CONTROL TECHNOLOGIES 9, 2009, 1 (01) :807-814
[4]   A short-cut method for assessing absorbents for post-combustion carbon dioxide capture [J].
Notz, Ralf ;
Toennies, Inga ;
Mangalapally, Hari Prasad ;
Hoch, Sebastian ;
Hasse, Hans .
INTERNATIONAL JOURNAL OF GREENHOUSE GAS CONTROL, 2011, 5 (03) :413-421
[5]  
Sieder G, 2010, 4 INT CO2 FOR P SOG
[6]  
Spuhl O, 2010, ENERGY PROCEDIA
[7]   ENERGY-CONSERVATION IN REGENERATED CHEMICAL ABSORPTION PROCESSES [J].
THOMPSON, RE ;
KING, CJ .
CHEMICAL ENGINEERING AND PROCESSING-PROCESS INTENSIFICATION, 1987, 21 (03) :115-129