Integrated berth and yard space allocation under uncertainty

被引:73
作者
Zhen, Lu [1 ]
Zhuge, Dan [1 ]
Wang, Shuaian [2 ]
Wang, Kai [3 ]
机构
[1] Shanghai Univ, Sch Management, Shanghai, Peoples R China
[2] Hong Kong Polytechn Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R China
[3] Tsinghua Univ, Sch Vehicle & Mobil, Beijing, Peoples R China
基金
中国国家自然科学基金;
关键词
Berth allocation; Yard space allocation; Uncertainty; Two-stage stochastic integer program; Column generation; QUAY CRANE ASSIGNMENT; MARINE CONTAINER TERMINALS; TRANSSHIPMENT TERMINALS; PRICE ALGORITHM; TACTICAL BERTH; TIME; TEMPLATE; OPTIMIZATION; PORT; FORMULATIONS;
D O I
10.1016/j.trb.2022.05.011
中图分类号
F [经济];
学科分类号
02 ;
摘要
Improving container ports' operational efficiency to reduce the delays at ports concerns global port operators significantly. Optimizing the tactical level allocation of quay side and yard side resources to vessel calls is a typical lever to mitigate the delays in operations. Another lever is by strategical level planning that re-adjust the preferred visiting time windows of vessel calls. It aims to absorb the delays at the scheduling stage rather than in the operations stage. This paper integrates the planning and operations at container ports to jointly optimize strategical level planning and tactical level berth and yard space allocation under uncertain vessel arrival times and uncertain numbers of loading/unloading containers. The problem is formulated as a two stage stochastic integer programming model. To solve it, we develop an original decomposition algorithm that passes columns of second-stage problems to the first-stage problem to approximate the second-stage decision making. Numerical experiments are conducted to validate the effectiveness and efficiency of our proposed algorithm. Some managerial implications for port operators are also obtained.
引用
收藏
页码:1 / 27
页数:27
相关论文
共 75 条
[1]   MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem [J].
Agra, Agostinho ;
Oliveira, Maryse .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 264 (01) :138-148
[2]   Ports' role in shipping decarbonisation: A common port incentive scheme for shipping greenhouse gas emissions reduction [J].
Alamoush, Anas S. ;
Olcer, Aykut I. ;
Ballini, Fabio .
CLEANER LOGISTICS AND SUPPLY CHAIN, 2022, 3
[3]   VALUE OF INFORMATION AND STOCHASTIC PROGRAMMING [J].
AVRIEL, M ;
WILLIAMS, AC .
OPERATIONS RESEARCH, 1970, 18 (05) :947-&
[4]   A follow-up survey of berth allocation and quay crane scheduling problems in container terminals [J].
Bierwirth, Christian ;
Meisel, Frank .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 244 (03) :675-689
[5]   A survey of berth allocation and quay crane scheduling problems in container terminals [J].
Bierwirth, Christian ;
Meisel, Frank .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 202 (03) :615-627
[6]   A Base Integer Programming Model and Benchmark Suite for Liner-Shipping Network Design [J].
Brouer, Berit D. ;
Alvarez, J. Fernando ;
Plum, Christian E. M. ;
Pisinger, David ;
Sigurd, Mikkel M. .
TRANSPORTATION SCIENCE, 2014, 48 (02) :281-312
[7]   The service allocation problem at the Giola Tauro Maritime Terminal [J].
Cordeau, Jean-Francois ;
Gaudioso, Manlio ;
Laporte, Gilbert ;
Moccia, Luigi .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 176 (02) :1167-1184
[8]   Models and tabu search heuristics for the Berth-allocation problem [J].
Cordeau, JF ;
Laporte, G ;
Legato, P ;
Moccia, L .
TRANSPORTATION SCIENCE, 2005, 39 (04) :526-538
[9]   New exact methods for the time-invariant berth allocation and quay crane assignment problem [J].
Correcher, Juan F. ;
Alvarez-Valdes, Ramon ;
Tamarit, Jose M. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 275 (01) :80-92
[10]   The Berth Allocation Problem with Channel Restrictions [J].
Corry, Paul ;
Bierwirth, Christian .
TRANSPORTATION SCIENCE, 2019, 53 (03) :708-727