Multi-mode resource-constrained project scheduling problem with alternative project structures

被引:56
作者
Tao, Sha [1 ]
Dong, Zhijie Sasha [2 ]
机构
[1] Nanjing Univ, Sch Management & Engn, Nanjing 210093, Jiangsu, Peoples R China
[2] Texas State Univ, Ingram Sch Engn, Ind Engn Program, San Marcos, TX 78666 USA
基金
中国国家自然科学基金;
关键词
Multi-mode resource-constrained project scheduling; Time-cost trade-off; Alternative project structures; AND-OR network; Hybrid metaheuristic; ALGORITHM; HEURISTICS;
D O I
10.1016/j.cie.2018.08.027
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper proposes to consider alternative project structures when dealing with the multi-mode resource constrained project scheduling problem. An AND-OR network is used to present this alternative project structures innovatively. The problem is formulated as a bi-objective linear integer program, which minimizes the makespan and total cost. A hybrid metaheuristic is developed based on AND-OR network to solve this NP-hard problem efficiently, which nests adapted Tabu Search (outer layer) and NSGA-II algorithm (inner layer). A large amount of computational experiments of different sizes are conducted, and compared with solutions generated by CPLEX, traditional Tabu Search, enumeration-based method and single-layer NSGA-II. The experimental results show the advantages of the proposed model and method, especially with large-size problems.
引用
收藏
页码:333 / 347
页数:15
相关论文
共 37 条
[1]   Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms [J].
Alcaraz, J ;
Maroto, C ;
Ruiz, R .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2003, 54 (06) :614-626
[2]  
[Anonymous], 2001, THESIS TU BERLIN
[3]  
Balas E, 1971, APPL MATH PROGRAMMIN, P187
[4]   RESOURCE CONSTRAINED SCHEDULING OF HIERARCHICALLY STRUCTURED DESIGN ACTIVITY NETWORKS [J].
BELHE, U ;
KUSIAK, A .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1995, 42 (02) :150-158
[5]   Hybrid Genetic Algorithm with Simulated Annealing for Resource-Constrained Project Scheduling [J].
Bettemir, Onder Halis ;
Sonmez, Rifat .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (05)
[6]   Resource-constrained project scheduling: Notation, classification, models, and methods [J].
Brucker, P ;
Drexl, A ;
Mohring, R ;
Neumann, K ;
Pesch, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 112 (01) :3-41
[7]   HEURISTICS FOR SCHEDULING RESOURCE CONSTRAINED PROJECTS - EXPERIMENTAL INVESTIGATION [J].
COOPER, DF .
MANAGEMENT SCIENCE, 1976, 22 (11) :1186-1194
[8]   A fast and elitist multiobjective genetic algorithm: NSGA-II [J].
Deb, K ;
Pratap, A ;
Agarwal, S ;
Meyarivan, T .
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (02) :182-197
[9]  
Demeulemeester E, 2002, INT SERIES OPERATION, V49
[10]  
Dong Z.S., 2018, P 2018 IISE ANN C OR, P1801