Solving Stochastic Flexible Flow Shop Scheduling Problems with a Decomposition-Based Approach

被引:3
作者
Wang, K. [1 ]
Choi, S. H. [1 ]
机构
[1] Univ Hong Kong, Dept Ind & Mfg Syst Engn, Hong Kong, Hong Kong, Peoples R China
来源
IAENG TRANSACTIONS ON ENGINEERING TECHNOLOGIES, VOL 4 | 2010年 / 1247卷
关键词
back propagation network; decomposition; flexible flow shop; neighbouring K-means clustering algorithm; stochastic processing times; ENVIRONMENT; ROBUST; NUMBER;
D O I
10.1063/1.3460245
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Real manufacturing is dynamic and tends to suffer a lot of uncertainties. Research on production scheduling under uncertainty has recently received much attention. Although various approaches have been developed for scheduling under uncertainty, this problem is still difficult to tackle by any single approach, because of its inherent difficulties. This chapter describes a decomposition-based approach (DBA) for makespan minimisation of a flexible flow shop (FFS) scheduling problem with stochastic processing times. The DBA decomposes an FFS into several machine clusters which can be solved more easily by different approaches. A neighbouring K-means clustering algorithm is developed to firstly group the machines of an FFS into an appropriate number of machine clusters, based on a weighted cluster validity index. A back propagation network (BPN) is then adopted to assign either the Shortest Processing Time (SPT) Algorithm or the Genetic Algorithm (GA) to generate a sub-schedule for each machine cluster. After machine grouping and approach assignment, an overall schedule is generated by integrating the sub-schedules of the machine clusters. Computation results reveal that the DBA is superior to SPT and GA alone for FFS scheduling under stochastic processing times, and that it can be easily adapted to schedule FFS under other uncertainties.
引用
收藏
页码:374 / 388
页数:15
相关论文
共 50 条
[41]   A multi-level optimization approach for energy-efficient flexible flow shop scheduling [J].
Yan, Jihong ;
Li, Lin ;
Zhao, Fu ;
Zhang, Fenyang ;
Zhao, Qingliang .
JOURNAL OF CLEANER PRODUCTION, 2016, 137 :1543-1552
[42]   A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines [J].
Tan, Yi ;
Moench, Lars ;
Fowler, John W. .
JOURNAL OF SCHEDULING, 2018, 21 (02) :209-226
[43]   Research on the Improved Dragonfly Algorithm-Based Flexible Flow-Shop Scheduling [J].
Han, Zhonghua ;
Zhang, Jingyuan ;
Lin, Shuo ;
Liu, Chunguang .
PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE ON MODELLING, IDENTIFICATION AND CONTROL (ICMIC2019), 2020, 582 :205-214
[44]   Greedy Algorithm Solution of Flexible Flow Shop Scheduling Problem [J].
Li, Xiaofeng ;
Zhao, Hai .
INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2009, 9 (11) :177-180
[45]   Combinatorial optimization of stochastic multi-objective problems: An application to the flow-shop scheduling problem [J].
Liefooghe, Arnaud ;
Basseur, Matthieu ;
Jourdan, Laetitia ;
Talbi, El-Ghazali .
EVOLUTIONARY MULTI-CRITERION OPTIMIZATION, PROCEEDINGS, 2007, 4403 :457-+
[46]   A review of scheduling problem and resolution methods in flexible flow shop [J].
Lee, Tian-Soon ;
Loong, Ying-Tai .
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2019, 10 (01) :67-88
[47]   Scheduling Flexible Flow Shop in Labeling Companies to Minimize the Makespan [J].
Wang, Chia-Nan ;
Hsu, Hsien-Pin ;
Fu, Hsin-Pin ;
Nguyen Ky Phuc Phan ;
Van Thanh Nguyen .
COMPUTER SYSTEMS SCIENCE AND ENGINEERING, 2022, 40 (01) :17-36
[48]   A cluster-based scheduling model using SPT and SA for dynamic hybrid flow shop problems [J].
Wang, Kai ;
Choi, Shiu Hong ;
Qin, Hu ;
Huang, Yun .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 67 (9-12) :2243-2258
[49]   A New Hybrid Multi-Objective Scheduling Model for Hierarchical Hub and Flexible Flow Shop Problems [J].
Aghakhani, Sina ;
Rajabi, Mohammad Sadra .
APPLIEDMATH, 2022, 2 (04) :721-737
[50]   An efficient tabu search algorithm for flexible flow shop sequence-dependent group scheduling problems [J].
Shahvari, Omid ;
Salmasi, Nasser ;
Logendran, Rasaratnam ;
Abbasi, Babak .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (15) :4237-4254