Solving Stochastic Flexible Flow Shop Scheduling Problems with a Decomposition-Based Approach

被引:3
作者
Wang, K. [1 ]
Choi, S. H. [1 ]
机构
[1] Univ Hong Kong, Dept Ind & Mfg Syst Engn, Hong Kong, Hong Kong, Peoples R China
来源
IAENG TRANSACTIONS ON ENGINEERING TECHNOLOGIES, VOL 4 | 2010年 / 1247卷
关键词
back propagation network; decomposition; flexible flow shop; neighbouring K-means clustering algorithm; stochastic processing times; ENVIRONMENT; ROBUST; NUMBER;
D O I
10.1063/1.3460245
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Real manufacturing is dynamic and tends to suffer a lot of uncertainties. Research on production scheduling under uncertainty has recently received much attention. Although various approaches have been developed for scheduling under uncertainty, this problem is still difficult to tackle by any single approach, because of its inherent difficulties. This chapter describes a decomposition-based approach (DBA) for makespan minimisation of a flexible flow shop (FFS) scheduling problem with stochastic processing times. The DBA decomposes an FFS into several machine clusters which can be solved more easily by different approaches. A neighbouring K-means clustering algorithm is developed to firstly group the machines of an FFS into an appropriate number of machine clusters, based on a weighted cluster validity index. A back propagation network (BPN) is then adopted to assign either the Shortest Processing Time (SPT) Algorithm or the Genetic Algorithm (GA) to generate a sub-schedule for each machine cluster. After machine grouping and approach assignment, an overall schedule is generated by integrating the sub-schedules of the machine clusters. Computation results reveal that the DBA is superior to SPT and GA alone for FFS scheduling under stochastic processing times, and that it can be easily adapted to schedule FFS under other uncertainties.
引用
收藏
页码:374 / 388
页数:15
相关论文
共 50 条
  • [21] A swarm optimization approach for flexible flow shop scheduling with multiprocessor tasks
    Manas Ranjan Singh
    S. S. Mahapatra
    The International Journal of Advanced Manufacturing Technology, 2012, 62 : 267 - 277
  • [22] Stochastic flexible flow shop scheduling problem with limited buffers and fixed interval preventive maintenance: a hybrid approach of simulation and metaheuristic algorithms
    Rooeinfar, R.
    Raissi, S.
    Ghezavati, V. R.
    SIMULATION-TRANSACTIONS OF THE SOCIETY FOR MODELING AND SIMULATION INTERNATIONAL, 2019, 95 (06): : 509 - 528
  • [23] Decomposition-Based Multi-Objective Optimization for Energy-Aware Distributed Hybrid Flow Shop Scheduling with Multiprocessor Tasks
    Jiang, Enda
    Wang, Ling
    Wang, Jingjing
    TSINGHUA SCIENCE AND TECHNOLOGY, 2021, 26 (05) : 646 - 663
  • [24] GPU based parallel genetic algorithm for solving an energy efficient dynamic flexible flow shop scheduling problem
    Luo, Jia
    Fujimura, Shigeru
    El Baz, Didier
    Plazolles, Bastien
    JOURNAL OF PARALLEL AND DISTRIBUTED COMPUTING, 2019, 133 : 244 - 257
  • [25] A stable reactive approach in dynamic flexible flow shop scheduling with unexpected disruptions: A case study
    Rahmani, Donya
    Ramezanian, Reza
    COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 98 : 360 - 372
  • [26] Metaheuristics for solving a flexible flow-shop scheduling problem with s-batching machines
    Rocholl, Jens
    Moench, Lars
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2025, 32 (01) : 38 - 68
  • [27] An Effective Heuristic Algorithm for Flexible Flow Shop Scheduling Problems with Parallel Batch Processing
    Turgay S.
    Aydın A.
    Manufacturing and Service Operations Management, 2023, 4 (01): : 62 - 70
  • [28] Surrogate Measures for the Robust Scheduling of Stochastic Job Shop Scheduling Problems
    Xiao, Shichang
    Sun, Shudong
    Jin, Jionghua
    ENERGIES, 2017, 10 (04)
  • [29] A decomposition-based heuristic for large employee scheduling problems with inter-department transfers
    Attia, Dalia
    Burgy, Reinhard
    Desaulniers, Guy
    Soumis, Francois
    EURO JOURNAL ON COMPUTATIONAL OPTIMIZATION, 2019, 7 (04) : 325 - 357
  • [30] Decomposition of Timed Automata for Solving Scheduling Problems
    Nishi, Tatsushi
    Wakatake, Masato
    Inuiguchi, Masahiro
    2008 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS (SMC), VOLS 1-6, 2008, : 2458 - 2463