Time-Dependent Reliability of PSC Box-Girder Bridge Considering Creep, Shrinkage, and Corrosion

被引:70
|
作者
Guo, Tong [1 ]
Sause, Richard [2 ]
Frangopol, Dan M. [2 ]
Li, Aiqun [3 ]
机构
[1] Southeast Univ, Minist Educ, Key Lab Concrete & Prestressed Concrete Struct, Nanjing 210096, Peoples R China
[2] Lehigh Univ, ATLSS Ctr, Dept Civil & Environm Engn, Bethlehem, PA 18015 USA
[3] Southeast Univ, Coll Civil Engn, Nanjing 210096, Peoples R China
基金
中国国家自然科学基金;
关键词
Time-dependent reliability; Prestressed concrete box girder; Creep and shrinkage; Corrosion; Probabilistic finite-element method; PITTING CORROSION; PRESTRESS LOSSES; CONCRETE; BEAMS; PERFORMANCE; BEHAVIOR; SCHEME;
D O I
10.1061/(ASCE)BE.1943-5592.0000135
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Bridge performance undergoes time-varying changes when exposed to aggressive environments. While much work has been done on bridge reliability under corrosion, little is known about the effects of creep and shrinkage on the reliability of concrete bridges. In this paper, the CEB-FIP model for creep and shrinkage is applied by using finite-element (FE) analysis in conjunction with probabilistic considerations. Verification is made by comparing the analytical findings with existing test data. More specifically, a time-dependent reliability assessment is made for a composite prestressed concrete (PSC) box-girder bridge exposed to a chloride environment. This realized via an advanced probabilistic FE method. The postcracking behavior of the thin-walled box girder is described using composite degenerated shell elements, and importance sampling is used to improve the efficiency of the reliability analyses. It is shown that concrete creep and shrinkage dominate during the early stages of bridge structure deterioration. This is accompanied by a decrease in reliability owing to the combined action of creep, shrinkage, and corrosion. The reliability indexes for the serviceability and the tendon yielding limit state fall below the target levels prior to the expected service life. Therefore, early maintenance and/or repair measures are required.
引用
收藏
页码:29 / 43
页数:15
相关论文
共 50 条
  • [1] Time-Dependent Reliability Assessment of Long-Span PSC Box-Girder Bridge Considering Vehicle-Induced Cyclic Creep
    Chen, Zheheng
    Guo, Tong
    Zhou, Guangdong
    Liu, Xingwang
    Fu, Yixiao
    Liu, Hua
    JOURNAL OF BRIDGE ENGINEERING, 2023, 28 (04)
  • [2] Random Field-Based Time-Dependent Reliability Analyses of a PSC Box-Girder Bridge
    Chen, Zheheng
    Guo, Tong
    Liu, Shaobo
    Lin, Weiwei
    APPLIED SCIENCES-BASEL, 2019, 9 (20):
  • [3] Time-dependent reliability of strengthened PSC box-girder bridge using phased and incremental static analyses
    Guo, Tong
    Chen, Zheheng
    Liu, Tie
    Han, Dazhang
    ENGINEERING STRUCTURES, 2016, 117 : 358 - 371
  • [4] Time-dependent Camber Deformation Reliability of High-speed Railway PSC Box Girder Considering Creep Effect
    Zou H.
    Lu Z.
    Yu Z.
    Tiedao Xuebao, 2019, 6 (107-114): : 107 - 114
  • [5] Stress distributions of PSC box girder bridge due to creep shrinkage effect
    Praja, Baskoro Abdi
    6TH INTERNATIONAL CONFERENCE OF EURO ASIA CIVIL ENGINEERING FORUM (EACEF 2017), 2017, 138
  • [6] Time-dependent behavior of PC box girder bridges considering non-uniform shrinkage and creep
    Xiang, Yiqiang
    He, Xiaoyang
    Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 2015, 47 (12): : 117 - 122
  • [7] Time-dependent reliability of PSC bridge box-girders exposed to aggressive environments
    Guo, T.
    Sause, R.
    Frangopol, D. M.
    Li, A. Q.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE-CYCLE OPTIMIZATION, 2010, : 2001 - 2008
  • [8] Deflection Reliability Analysis of PSC Box-Girder Bridge Under High-Speed Railway Loads
    Guo, Tong
    Liu, Tie
    Li, Aiqun
    ADVANCES IN STRUCTURAL ENGINEERING, 2012, 15 (11) : 2001 - 2011
  • [9] Probabilistic analysis of creep and shrinkage effects in PSC box girder bridges
    In-Hwan Yang
    KSCE Journal of Civil Engineering, 2003, 7 (3) : 275 - 284
  • [10] Sensitivity analysis of time-dependent behavior in PSC box girder bridges
    Oh, BH
    Yang, IH
    JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 2000, 126 (02): : 171 - 179