Measuring Project Management Performance: Case of Construction Industry

被引:52
作者
Demirkesen, Sevilay [1 ]
Ozorhon, Beliz [2 ]
机构
[1] Univ Calif Berkeley, Dept Civil & Environm Engn, Berkeley, CA 94704 USA
[2] Bogazici Univ, Bebek, Turkey
关键词
Construction; Modeling; Project Performance; Project Management; HUMAN-RESOURCE MANAGEMENT; CRITICAL SUCCESS FACTORS; ENVIRONMENTAL-MANAGEMENT; STAKEHOLDER MANAGEMENT; KNOWLEDGE MANAGEMENT; COST ESTIMATION; INFORMATION-TECHNOLOGY; PORTFOLIO MANAGEMENT; ASSESSING IMPACTS; RISK MANAGEMENT;
D O I
10.1080/10429247.2017.1380579
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study develops construction-specific determinants and indicators of project management performance based on the 14 knowledge areas of the project management body of knowledge guide. Interrelations among the knowledge areas and influence of these factors on performance are investigated. Data collected from 121 construction projects are analyzed using structural equation modeling. Research findings suggest that project integration, communications, safety, risk, human resources, financial, and cost management have a direct impact, whereas scope and time management have an indirect effect on performance. The findings reported in this study are expected to help construction project managers devise and implement strategies and develop actions to improve project success. An engineering manager can use the framework developed in this research to define the underlying factors of efficient project management practices.
引用
收藏
页码:258 / 277
页数:20
相关论文
共 211 条
[1]   Process model for administrating construction claims [J].
Abdul-Malak, MAU ;
El-Saadi, MMH ;
Abou-Zeid, MG .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2002, 18 (02) :84-94
[2]   Feature based process framework to manage scope in dynamic NPD portfolios [J].
Abrantes, Rui ;
Figueiredo, Jose .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (05) :874-884
[3]  
Achterkamp Marjolein C., 2008, International Journal of Project Management, V26, P749, DOI 10.1016/j.ijproman.2007.10.001
[4]   Exploring the Relationship Between Multi-Dimensional Top Management Support and Project Success: An International Study [J].
Ahmed, Riaz ;
Bin Mohamad, Noor Azmi .
ENGINEERING MANAGEMENT JOURNAL, 2016, 28 (01) :54-67
[5]   Analysis of cost and schedule performance of international development projects [J].
Ahsan, Kamrul ;
Gunawan, Indra .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2010, 28 (01) :68-78
[6]   The accuracy of pre-tender building cost estimates in Australia [J].
Aibinu, Ajibade Ayodeji ;
Pasco, Thomas .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2008, 26 (12) :1257-1269
[7]  
Akanni P. O., 2015, HBRC Journal, V11, P91, DOI 10.1016/j.hbrcj.2014.02.010
[8]   SYSTEMATIC-RISK MANAGEMENT APPROACH FOR CONSTRUCTION PROJECTS [J].
ALBAHAR, JF ;
CRANDALL, KC .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1990, 116 (03) :533-546
[9]   Enhancing construction hazard recognition and communication with energy-based cognitive mnemonics and safety meeting maturity model: Multiple baseline study [J].
Albert, Alex ;
Hallowell, Matthew R. ;
Kleiner, Brian M. .
Journal of Construction Engineering and Management, 2014, 140 (02)
[10]  
Ali H.A. E. M., 2013, Journal of King Saud University - Engineering Sciences, V25, P125, DOI [DOI 10.1016/J.JKSUES.2012.03.002, 10.1016/j.jksues.2012.03.002]