Advanced Run-to-Run Controller in Semiconductor Manufacturing with Real-time Equipment Condition APC: Advanced Process Control; AM: Advanced Metrology

被引:0
作者
Yang, Wei-Ting [1 ,2 ]
Blue, Jakey [1 ,2 ]
Roussy, Agnes [1 ,2 ]
Reis, Marco [3 ]
Pinaton, Jacques [4 ]
机构
[1] CMP Georges Charpak, Ecole Mines St Etienne, Dept Mfg Sci & Logist, 880 Route Mimet, F-13541 Gardanne, France
[2] CNRS, UMR 6158, LIMOS, Paris, France
[3] Univ Coimbra, CIEPQPF, Dept Chem Engn, Coimbra, Portugal
[4] STMicroelet Rousset, Dept Proc Control, 190 Ave Coq Monnet, F-13106 Rousset, France
来源
2018 29TH ANNUAL SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE (ASMC) | 2018年
关键词
Run-to-Run (R2R); Fault Detection and Classification (FDC); Wafer Metrology; Equipment Condition; Graphic Gaussian Model (GGM);
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Run-to-Run (R2R) control has become a common process regulating approach in the semiconductor industry. Conventionally, key process parameters are regulated with respect to the measured metrology data. However, wafer quality can be affected by complex factors related to equipment condition. The steady progress of information technologies enable us to collect and handle larger amounts of data, open new perspectives to explore the interactions between FDC (Fault Detection and Classification) data and product quality, i.e., wafer metrology, which should be considered simultaneously for developing improved R2R controllers. In this paper, the equipment condition is explicitly modeled and integrated into the core of a R2R controller, in order to accommodate this critical aspect of the system in deriving the control law, in order to reduce process variability in more effective way. Therefore, a new R2R control framework is proposed, which is called: Controller with Real-time Equipment Condition (CREC). The effectiveness of the new control strategy is demonstrated and validated using the case study of a Chemical-Mechanical Polishing (CMP) process, in collaboration with our industrial partner.
引用
收藏
页码:346 / 352
页数:7
相关论文
共 14 条
  • [1] Boning D. S., 1996, IEEE Transactions on Components, Packaging & Manufacturing Technology, Part C (Manufacturing), V19, P307, DOI 10.1109/3476.558560
  • [2] Box GeorgeEP., 1974, Time series analysis: forecasting and control
  • [3] SUPERVISORY RUN-TO-RUN CONTROL OF POLYSILICON GATE ETCH USING IN-SITU ELLIPSOMETRY
    BUTLER, SW
    STEFANI, JA
    [J]. IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 1994, 7 (02) : 193 - 201
  • [4] Chen A., IEEE T SEMICONDUCTOR, V14, P11
  • [5] Virtual metrology: A solution for wafer to wafer advanced process control
    Chen, PH
    Wu, S
    Lin, JS
    Ko, F
    Lo, H
    Wang, J
    Yu, CH
    Liang, MS
    [J]. ISSM 2005: IEEE International Symposium on Semiconductor Manufacturing, Conference Proceedings, 2005, : 155 - 157
  • [6] Run-to-run process control: Literature review and extensions
    DelCastillo, E
    Hurwitz, AM
    [J]. JOURNAL OF QUALITY TECHNOLOGY, 1997, 29 (02) : 184 - 196
  • [7] Sparse inverse covariance estimation with the graphical lasso
    Friedman, Jerome
    Hastie, Trevor
    Tibshirani, Robert
    [J]. BIOSTATISTICS, 2008, 9 (03) : 432 - 441
  • [8] Virtual metrology for run-to-run control in semiconductor manufacturing
    Kang, Pilsung
    Kim, Dongil
    Lee, Hyoung-joo
    Doh, Seungyong
    Cho, Sungzoon
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (03) : 2508 - 2522
  • [9] Scutari M., 2009, ARXIV09083817STAT
  • [10] Run by run advanced process control of metal sputter deposition
    Smith, TH
    Boning, DS
    Stefani, J
    Butler, SW
    [J]. IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 1998, 11 (02) : 276 - 284