Heuristic solution methods for the stochastic flow shop problem

被引:35
作者
Baker, Kenneth R. [1 ]
Altheimer, Dominik [2 ]
机构
[1] Dartmouth Coll, Tuck Sch Business, Hanover, NH 03755 USA
[2] Helmut Schmidt Univ, Hamburg, Germany
关键词
Stochastic scheduling; Flow shop; Makespan; Lognormal distribution; SEQUENCING PROBLEM; SCHEDULING HEURISTICS; EXPECTED MAKESPAN; M-MACHINE; N-JOB; TIMES;
D O I
10.1016/j.ejor.2011.07.021
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We investigate the stochastic flow shop problem with m machines and general distributions for processing times. No analytic method exists for solving this problem, so we looked instead at heuristic methods. We devised three constructive procedures with modest computational requirements, each based on approaches that have been successful at solving the deterministic counterpart. We compared the performance of these procedures experimentally on a set of test problems and found that all of them achieve near-optimal performance. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:172 / 177
页数:6
相关论文
共 21 条
[1]  
[Anonymous], 2009, PRINCIPLES SEQUENCIN, DOI DOI 10.1002/9780470451793
[2]   Three heuristic procedures for the stochastic, two-machine flow shop problem [J].
Baker, Kenneth R. ;
Trietsch, Dan .
JOURNAL OF SCHEDULING, 2011, 14 (05) :445-454
[3]   Safe scheduling: Setting due dates in single-machine problems [J].
Baker, Kenneth R. ;
Trietsch, Dan .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 196 (01) :69-77
[4]  
Campbell HerbertG., 1970, Management Science, V16, P630, DOI [10.1287/mnsc.16.10.b630, DOI 10.1287/MNSC.16.10.B630]
[5]   SCHEDULING JOBS, WITH EXPONENTIALLY DISTRIBUTED PROCESSING TIMES, ON 2 MACHINES OF A FLOW SHOP [J].
CUNNINGHAM, AA ;
DUTTA, SK .
NAVAL RESEARCH LOGISTICS, 1973, 20 (01) :69-81
[6]   A review and classification of heuristics for permutation flow-shop scheduling with makespan objective [J].
Framinan, JM ;
Gupta, JND ;
Leisten, R .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2004, 55 (12) :1243-1255
[7]   A contribution to the stochastic flow shop scheduling problem [J].
Gourgand, M ;
Grangeon, N ;
Norre, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 151 (02) :415-433
[8]   Flowshop-scheduling problems with makespan criterion: a review [J].
Hejazi, SR ;
Saghafian, S .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2005, 43 (14) :2895-2929
[9]   A NEW HEURISTIC FOR THE N-JOB, M-MACHINE FLOWSHOP PROBLEM [J].
HO, JC ;
CHANG, YL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 52 (02) :194-202
[10]  
Johnson S.M., 1954, NAVAL RES LOGISTICS, V1, P61, DOI [DOI 10.1002/NAV.3800010110, 10.1002/nav.3800010110]