Construction of a large underground station under a station in operation

被引:0
|
作者
Niibori, T. [1 ]
Seki, Y. [1 ]
Sato, T. [1 ]
Yamada, T. [1 ]
Fujiwara, T. [2 ]
机构
[1] E Japan Railway Co, Tokyo Construct Off, Tokyo, Japan
[2] E Japan Railway Co, Construct Engn Ctr, Tokyo, Japan
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A four- and five-tier box-shaped underground station, measuring 25 m in width and 420 m in length, was constructed by East Japan Railway Company at a depth of about 25 m immediately under Yokohama Station through which about 2.3 million passengers pass each day, to link the Minatomirai Line with the Tokyu Toyoko Line. The construction work faced various challenges, including excavation through special geology, the high level of groundwater, tunneling for a railroad immediately under a large terminal station, and severe restrictions on construction due to live flows of passengers. These obstacles were overcome by meticulous engineering studies and technical development, as a result of which the underground station was finally completed two months ahead of schedule.
引用
收藏
页码:143 / +
页数:2
相关论文
共 50 条
  • [41] Research on Power Benefits Assessment of SiPing Hydropower Station under the Operation of Sanliping Hydropower Station
    Tian Yu
    Lei Xiaohui
    Yu Qian
    Sun Jialan
    2010 INTERNATIONAL CONFERENCE ON COMMUNICATION AND VEHICULAR TECHNOLOGY (ICCVT 2010), VOL II, 2010, : 10 - 13
  • [42] METAMORPHOSES - AN UNDERGROUND STATION AND A ROUNDABOUT
    GREENBERG, S
    ARCHITECTURAL DESIGN, 1980, 50 (11-1) : A41 - A41
  • [43] Stability analysis of surrounding rock during construction process for large underground caverns at the Jinping II Hydropower station
    Xu, Fu-Gang
    Yang, Xing-Guo
    Zhou, Jia-Wen
    Xing, Hui-Ge
    Huang, Kang-Xin
    Electronic Journal of Geotechnical Engineering, 2014, 19 U : 6331 - 6342
  • [44] Study on dynamic stability of large-scale underground cavern group during construction period of hydropower station
    Nie, Weiping
    Shi, Chong
    MECHANICAL ENGINEERING AND MATERIALS, PTS 1-3, 2012, 152-154 : 820 - +
  • [45] Case Record Of Phase 1 Of Kaohsiung Metro– Geotechnical Design And Construction Of A Large-Scale Underground Station
    Hsiung B.C.B.
    Chung L.J.
    Lin M.C.
    Hsiung, Bin Chen Benson (benson@nkust.edu.tw), 1600, Taiwan Geotechnical Society (15): : 205 - 214
  • [47] Safety Simulation Analysis on the Under Construction Metro Station Structure Traversed by the New Metro Station
    Wang, Chunhui
    Peng, Hua
    INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT (EBM2011), VOLS 1-6, 2011, : 1181 - 1185
  • [48] LARGE EXPERIMENTAL STATION FLINGERN FOR THE BURNING OF BITUMINOUS COAL IN A FLUIDIZED-BED - PLANNING, CONSTRUCTION AND OPERATION
    KRISCHKE, HG
    ERDOL & KOHLE ERDGAS PETROCHEMIE, 1984, 37 (08): : 370 - 370
  • [49] Seismic performance and effective isolation of a large multilayered underground subway station
    Yang Jing
    Zhuang Haiyang
    Wang Wei
    Zhou Zhenghua
    Chen Guoxing
    SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2021, 142
  • [50] Crossing construction methods of subway station under building
    Wang C.-B.
    Shao P.
    Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2019, 53 (01): : 69 - 77