ALGORITHMS FOR BICRITERIA MINIMIZATION IN THE PERMUTATION FLOW SHOP SCHEDULING PROBLEM

被引:3
作者
Mokotoff, Ethel [1 ]
机构
[1] Univ Alcala de Henares, Dept Fundamentos Econ, Madrid 28802, Spain
关键词
Deterministic Scheduling Theory; Management Decision Making; Multi-Objective Optimization; Flow-shop; Heuristics; MULTIOBJECTIVE GENETIC ALGORITHM; ANT COLONY OPTIMIZATION; HEURISTIC ALGORITHM; LOCAL SEARCH; M-MACHINE; N-JOB; MAKESPAN; TIME;
D O I
10.3934/jimo.2011.7.253
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents two bi-objective simulated annealing procedures to deal with the classical permutation flow shop scheduling problem considering the makespan and the total completion time as criteria. The proposed methods are based on multi-objective simulated annealing techniques combined with constructive and heuristic algorithms. A computational experiment has been carried out and different metrics have been computed to check various attributes of each method. For all the tested instances a net set of potentially efficient schedules has been obtained and compared with previously published results. Results indicate that the proposed algorithms provide efficient solutions with little computational effort which can serve as input for interactive procedures.
引用
收藏
页码:253 / 282
页数:30
相关论文
共 55 条
  • [1] [Anonymous], 2006, MULTICRITERIA SCHEDU, DOI DOI 10.1007/B106275
  • [2] [Anonymous], CORS J
  • [3] [Anonymous], 1999, Evolutionary Algorithms for Multiobjective Optimization: Methods and Applications
  • [4] Genetic local search for multi-objective flowshop scheduling problems
    Arroyo, JEC
    Armentano, VA
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 167 (03) : 717 - 738
  • [5] Bagchi T., 1999, MULTIOBJECTIVE SCHED
  • [6] The development of gradual-priority weighting approach for the multi-objective flowshop scheduling problem
    Chang, PC
    Hsieh, JC
    Lin, SG
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 79 (03) : 171 - 183
  • [7] Sub-population genetic algorithm with mining gene structures for multiobjective flowshop scheduling problems
    Chang, Pei-Chann
    Chen, Shih-Hsin
    Liu, Chen-Hao
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2007, 33 (03) : 762 - 771
  • [8] Czyzzak P., 1998, Journal of Multi-Criteria Decision Analysis, V7, P34, DOI DOI 10.1002/(SICI)1099-1360(199801)7:13.0.CO
  • [9] 2-6
  • [10] DANIELS RL, 1990, NAV RES LOG, V37, P981, DOI 10.1002/1520-6750(199012)37:6<981::AID-NAV3220370617>3.0.CO