Examination of Project Duration, Project Intensity, and Timing of Cost Certainty in Highway Project Delivery Methods

被引:44
作者
Antoine, Arthur L. C. [1 ]
Alleman, Douglas [2 ]
Molenaar, Keith R. [2 ]
机构
[1] Shrewsberry, 2696 South Colorado Blvd,Suite 460, Denver, CO 80222 USA
[2] Univ Colorado Boulder, Dept Civil Environm & Architectural Engn, Boulder, CO 80309 USA
关键词
DESIGN-BUILD; SELECTION; SYSTEMS;
D O I
10.1061/(ASCE)ME.1943-5479.0000661
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Although agencies design and construct the vast majority of federally funded highways through the traditional design-bid-build (DBB) method, the use of construction manager/general contractor (CM/GC) and design-build (DB) is increasing. Previous research articles on the performance of these delivery methods include projects of different characteristics and projects from different sectors. This study examined solely US highway projects through a unique analysis of comparable projects. This study compared the project delivery methods that are frequently used in two separate cost pools, $2 million to $10 million and $10 million to $50 million. In the cost pool of $2 million to $10 million, the delivery methods of DBB and low-bid-procured DB (DB/LB) were compared. The delivery methods of DBB, CM/GC, and best-value-procured DB (DB/BV) were compared in the cost pool of $10 million to $50 million. The results show that the alternative contracting methods of CM/GC and DB are superior to the traditional DBB method for the performance metrics of project duration, project intensity, and timing of cost certainty in both cost pools. In comparing the alternative contracting methods in the $10 million to $50 million cost range, the CM/GC method was found to outperform DB/BV, which has not yet been shown in the research literature. With pressure on state transportation agencies to be efficient with funds, the alternative contracting methods are viable options for shortening project durations, establishing early cost certainty during project delivery, and delivering projects at a more intense pace. The findings presented are useful for practitioners to better understand how project delivery methods can meet their needs for US highway construction. (C) 2018 American Society of Civil Engineers.
引用
收藏
页数:10
相关论文
共 52 条
  • [1] Comparison of Qualifications-Based Selection and Best-Value Procurement for Construction Manager-General Contractor Highway Construction
    Alleman, Douglas
    Antoine, Arthur
    Gransberg, Douglas D.
    Molenaar, Keith R.
    [J]. TRANSPORTATION RESEARCH RECORD, 2017, (2630) : 59 - 67
  • [2] Strategies for Enhancing Project Performance
    Anantatmula, Vittal S.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (06)
  • [3] [Anonymous], 2007, GUID COST EST MAN HI, DOI DOI 10.17226/14014
  • [4] [Anonymous], 2011, INT ENCY STAT SCI
  • [5] Beard J., 2001, DESIGN BUILD PLANNIN
  • [6] Bennett J., 1996, DESIGNING BUILDING W
  • [7] Bingham E, 2016, CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, P2110
  • [8] Project Delivery Method Performance for Public School Construction: Design-Bid-Build versus CM at Risk
    Carpenter, Noel
    Bausman, Dennis C.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (10)
  • [9] Time and Cost Performance of Design-Build Projects
    Chen, Qing
    Jin, Zhigang
    Xia, Bo
    Wu, Peng
    Skitmore, Martin
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (02)
  • [10] Dallal G.V, 2015, LITTLE HDB STAT PRAC