Optimizing Multi-stage Production for an Assembly-Type Supply Chain with Unequal Sized Batch Shipments

被引:4
|
作者
Ho, Wen-Tsung [1 ]
Pan, Jason Chao-Hsien [1 ]
Hsiao, Yu-Cheng [2 ]
机构
[1] Takming Univ Sci & Technol, Dept Business Adm, Taipei 11451, Taiwan
[2] Takming Univ Sci & Technol, Dept Logist, Taipei 11451, Taiwan
关键词
Inventory; Serial-type supply chain; Assembly-type supply chain; Lot size; Unequal sub-batch size; CONSTANT LOT-SIZE; CYCLE TIME DETERMINATION; PRODUCTION QUANTITY; SYSTEM; MODEL; PURCHASER;
D O I
10.1007/s10957-011-9951-y
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper studies the multi-stage logistics and inventory problem in an assembly-type supply chain where a uniform lot size is produced uninterruptedly with a single setup at each stage. Partial lots, or sub-batches, can be transported to next stage upon completion. Unequal sub-batch sizes at each stage follow geometric series and the numbers of sub-batches across stages are allowed to be different. Since the mainline and each branch line of an assembly-type supply chain are series-type supply chains, a model of the series-type supply chain is first established and a model of the assembly-type supply chain is subsequently developed. Optimization algorithms that determine the economic lot sizes, the optimal sub-batch sizes and the number of sub-batches for each stage are developed. The polynomial-time algorithms incorporate the optimality properties derived in the paper to find the lower and upper bounds of the solutions by constructing the solution ranges and then the optimal solutions accordingly.
引用
收藏
页码:513 / 531
页数:19
相关论文
共 50 条
  • [31] Multi-Product Multi-Stage Multi-Period Resource Allocation for Minimizing Batch-Processing Steel Production Cost
    Zhang, Zhuohan
    Zhao, Ziyan
    Qin, Shujin
    Liu, Shixin
    Zhou, Mengchu
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2024, : 5272 - 5283
  • [32] Supply Chain Modelling of the Automobile Multi-Stage Production Considering Circular Economy by Waste Management Using Recycling and Reworking Operations
    Omair, Muhammad
    Alkahtani, Mohammed
    Ayaz, Kashif
    Hussain, Ghulam
    Buhl, Johannes
    SUSTAINABILITY, 2022, 14 (22)
  • [33] Robust production planning and control for multi-stage systems with flexible final assembly lines
    Gyulai, David
    Pfeiffer, Andras
    Monostori, Laszlo
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (13) : 3657 - 3673
  • [34] Multi-stage supply chain scheduling with non-preemptive continuous operations and execution control
    Ivanov, Dmitry
    Sokolov, Boris
    Dolgui, Alexandre
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (13) : 4059 - 4077
  • [35] Effective hydrogen supply chain management framework considering nonlinear multi-stage process uncertainties
    Jang, Jaeuk
    Lee, Hyunsoo
    APPLIED ENERGY, 2024, 367
  • [36] Optimizing inventory and sales decisions in a two-stage supply chain with imperfect production and backorders
    Rad, Mona Ahmadi
    Khoshalhan, Farid
    Glock, Christoph H.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 74 : 219 - 227
  • [37] Solving a multi-stage multi-product solid supply chain network design problem by meta-heuristics
    Mahmoodirad, A.
    Sanei, M.
    SCIENTIA IRANICA, 2016, 23 (03) : 1429 - 1440
  • [38] Multi-stage investment planning and customer selection in a two-echelon multi-period supply chain design
    Abbasi, B.
    Mirzazadeh, A.
    Mohammadi, M.
    SCIENTIA IRANICA, 2019, 26 (05) : 3032 - 3050
  • [39] Examining the diffusion of electronic supply chain management with external antecedents and firm performance: A multi-stage analysis
    Wu, Ing-Long
    Chuang, Cheng-Hung
    DECISION SUPPORT SYSTEMS, 2010, 50 (01) : 103 - 115
  • [40] A hybrid multi-stage predictive model for supply chain network collapse recovery analysis: a practical framework for effective supply chain network continuity management
    Vahdani, B.
    Zandieh, M.
    Roshanaei, V.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (07) : 2035 - 2060