INTERPRETIVE STRUCTURAL MODELING IN EARNED VALUE MANAGEMENT

被引:7
作者
Bagherpour, Morteza [1 ]
Khaje Zadeh, Mohammad [1 ]
Mahmoudi, Amin [2 ]
Deng, Xiaopeng [2 ]
机构
[1] Iran Univ Sci & Technol, Dept Ind Engn, Tehran, Iran
[2] Southeast Univ, Sch Civil Engn, Dept Construct & Real Estate, Nanjing 210096, Peoples R China
基金
中国国家自然科学基金;
关键词
Earned Value Management; interpretive structural modelling; schedule and cost performance indexes; CPI; at completion costs; SUPPLY CHAIN MANAGEMENT; CONSTRUCTION PROJECTS; COST; TIME; QUALITY; OVERRUNS; RISK;
D O I
10.3846/jcem.2020.12182
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The primary purpose of the current study is introducing a comprehensive approach to identify the relationship among different criteria in Earned Value Management (EVM). EVM is a well-known approach in project management context that can monitor schedule and cost performance indexes in projects simultaneously. The EVM detects current project performances and also predicts at completion costs of the project. In this study, employing Interpretive Structural Modelling, interactions which exist among affecting factors on EVM's success are determined. First, all of the practical factors on EVM are determined and categorized into four main clusters; then the most effective ones are separated from the clusters; eventually, ISM is used based on eleven ultimate critical criteria. The results demonstrate that "Instability in the construction market" and "Macroeconomic indicators" are the most influencing factors affecting the EVM. Finally, a novel method for enhancing the performance of conventional EVM is presented. The proposed approach would be highly applicable for engineering managers who are willing to promote the current performance of the systems. Most studies have been previously carried out on the applications of the EVM in terms of improving final cost and total duration elapsed whereas there is not any particular study on the EVM issue which has stated the key factors that influence the EVM and lasting effect on the project performance. It should be noted that the proposed approach can be employed through the life cycle of any project particularly in construction projects.
引用
收藏
页码:524 / 533
页数:10
相关论文
共 38 条
[31]  
Soltes V., 2013, J APPL EC SCI, V8, P99
[32]  
Sujatha E. R., 2016, JORDAN J CIVIL ENG, V159, P1, DOI [10.1016/j.ijproman.2007.09.009, DOI 10.1016/J.IJPROMAN.2007.09.009]
[33]   Delays in construction projects: The case of Jordan [J].
Sweis, G. ;
Sweis, R. ;
Abu Hammad, A. ;
Shboul, A. .
International Journal of Project Management, 2008, 26 (06) :665-674
[34]   Application of Fuzzy Modelling to Predict Construction Projects Cash Flow [J].
Tabei, Sayed Mohammad Amin ;
Bagherpour, Morteza ;
Mahmoudi, Amin .
PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2019, 63 (02) :647-659
[35]   Critical cost factors of building construction projects in Malaysia [J].
Toh, Tien-Choon ;
Ting, Connie ;
Ali, Kherun-Nita ;
Aliagha, Godwin-Uche ;
Munir, Omar .
INTERNATIONAL CONFERENCE ON ASIA PACIFIC BUSINESS INNOVATION AND TECHNOLOGY MANAGEMENT, 2012, 57 :360-367
[36]   Cost Development Over-time at Construction Planning Phase: Empirical Evidence from Norwegian Construction Projects [J].
Torp, Olav ;
Belay, Alemu Moges ;
Thodesen, Carl ;
Klakegg, Ole Jonny .
ICSDEC 2016 - INTEGRATING DATA SCIENCE, CONSTRUCTION AND SUSTAINABILITY, 2016, 145 :1177-1184
[37]  
Xu Haiyan, 2019, Transactions of Nanjing University of Aeronautics & Astronautics, V36, P264, DOI 10.16356/j.1005-1120.2019.02.009
[38]   Time-thieves and bottlenecks in the Norwegian construction projects [J].
Zidane, Youcef J-T. ;
Johansen, Agnar ;
Andersen, Bjorn ;
Hoseini, Erfan .
8TH NORDIC CONFERENCE ON CONSTRUCTION ECONOMICS AND ORGANIZATION, 2015, 21 :486-493