共 38 条
[31]
Soltes V., 2013, J APPL EC SCI, V8, P99
[32]
Sujatha E. R., 2016, JORDAN J CIVIL ENG, V159, P1, DOI [10.1016/j.ijproman.2007.09.009, DOI 10.1016/J.IJPROMAN.2007.09.009]
[34]
Application of Fuzzy Modelling to Predict Construction Projects Cash Flow
[J].
PERIODICA POLYTECHNICA-CIVIL ENGINEERING,
2019, 63 (02)
:647-659
[35]
Critical cost factors of building construction projects in Malaysia
[J].
INTERNATIONAL CONFERENCE ON ASIA PACIFIC BUSINESS INNOVATION AND TECHNOLOGY MANAGEMENT,
2012, 57
:360-367
[36]
Cost Development Over-time at Construction Planning Phase: Empirical Evidence from Norwegian Construction Projects
[J].
ICSDEC 2016 - INTEGRATING DATA SCIENCE, CONSTRUCTION AND SUSTAINABILITY,
2016, 145
:1177-1184
[37]
Xu Haiyan, 2019, Transactions of Nanjing University of Aeronautics & Astronautics, V36, P264, DOI 10.16356/j.1005-1120.2019.02.009
[38]
Time-thieves and bottlenecks in the Norwegian construction projects
[J].
8TH NORDIC CONFERENCE ON CONSTRUCTION ECONOMICS AND ORGANIZATION,
2015, 21
:486-493