Flowshop scheduling to minimize the sum of weighted tardiness cost and weighted flowtime cost by synergy of heuristics

被引:0
作者
Sambandam, Narayanasamy [1 ]
Maniyan, Paranjothi [1 ]
机构
[1] Natl Inst Ind Engn, Bombay 400087, Maharashtra, India
来源
WMSCI 2007: 11TH WORLD MULTI-CONFERENCE ON SYSTEMICS, CYBERNETICS AND INFORMATICS, VOL I, PROCEEDINGS | 2007年
关键词
flowshop scheduling; makespan; tardiness cost; inventory holding cost; synergy and heuristics;
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Scheduling multi-job orders in a multi-machine environment is shown to be NP - Hard. The Flowshop scheduling to minimize the makespan as well as a complex cost function are extremely relevant in today's context of manufacturing. In this paper, synergy of heuristic methods which performed well for minimizing rnakespan as well as minimizing a complex cost function is reported. The flowshop scheduling that minimizes the sum of weighted tardiness cost and weighted flowtime cost has been solved by branch & bound method to obtain optimum solution. The computation time for solving the large size problem is reported to exponentially increase as the number of jobs and machines increases. Several heuristic methods have been developed to overcome these difficulties. These heuristic methods are on the basis of dynamic dispatching rules. Similarly both optimum and heuristic methods are developed for solving flowshop scheduling problem to minimize the makespan. The synergy of heuristics that perform well, aims to construct a good permutation sequence of jobs by adapting certain insertion approach. The flowshop scheduling problem to minimize the complex objective function is solved by existing heuristic methods as well as by the proposed synergy of heuristics. The extensive computational investigation reveals that the proposed synergy of heuristics out performed.
引用
收藏
页码:335 / 339
页数:5
相关论文
共 16 条