An activity-based approach for scheduling multimodal transit services

被引:74
作者
Li, Zhi-Chun [1 ,2 ]
Lam, William H. K. [1 ]
Wong, S. C. [3 ]
Sumalee, A. [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Civil & Struct Engn, Kowloon, Hong Kong, Peoples R China
[2] Huazhong Univ Sci & Technol, Sch Management, Wuhan 430074, Peoples R China
[3] Univ Hong Kong, Dept Civil Engn, Hong Kong, Hong Kong, Peoples R China
基金
中国国家自然科学基金;
关键词
Activity-based model; Scheduling/timetabling problem; Transit assignment; ASSIGNMENT MODEL; EQUILIBRIUM ASSIGNMENT; TIMETABLES; ALLOCATION; NETWORK;
D O I
10.1007/s11116-010-9291-z
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper proposes a new activity-based transit assignment model for investigating the scheduling (or timetabling) problem of transit services in multi-modal transit networks. The proposed model can be used to generate the short-term and long-term timetables of multimodal transit lines for transit operations and service planning purposes. The interaction between transit timetables and passenger activity-travel scheduling behaviors is captured by the proposed model, as the activity and travel choices of transit passengers are considered explicitly in terms of departure time choice, activity/trip chain choices, activity duration choice, transit line and mode choices. A heuristic solution algorithm which combines the Hooke-Jeeves method and an iterative supply-demand equilibrium approach is developed to solve the proposed model. Two numerical examples are presented to illustrate the differences between the activity-based approach and the traditional trip-based method, together with comparison on the effects of optimal timetables with even and uneven headways. It is shown that the passenger travel scheduling pattern derived from the activity-based approach is significantly different from that obtained by the trip-based method, and that a demand-sensitive (with uneven headway) timetable is more efficient than an even-headway timetable.
引用
收藏
页码:751 / 774
页数:24
相关论文
共 47 条
[1]  
[Anonymous], 1996, MATH PROGRAMS EQUILI, DOI DOI 10.1017/CBO9780511983658
[2]  
[Anonymous], 2003, FIXED POINT THEOR-RO, DOI DOI 10.1007/978-0-387-21593-8
[3]   A need-based model of multi-day, multi-person activity generation [J].
Arentze, Theo A. ;
Timmermans, Harry J. P. .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 2009, 43 (02) :251-265
[4]  
Ashiru O, 2004, TRANSPORT RES REC, P84
[5]  
Bazaraa M.S., 1990, LINEAR PROGRAMMING N, DOI DOI 10.1002/0471787779
[6]  
Ben-Akiva M. E., 1985, Discrete choice analysis: Theory and application to travel demand, V9
[7]   Modeling and solving the train timetabling problem [J].
Caprara, A ;
Fischetti, M ;
Toth, P .
OPERATIONS RESEARCH, 2002, 50 (05) :851-861
[8]  
Ceder A, 2003, ADVANCED MODELING FOR TRANSIT OPERATIONS AND SERVICE PLANNING, P31
[9]   METHODS FOR CREATING BUS TIMETABLES [J].
CEDER, A .
TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 1987, 21 (01) :59-83
[10]   Inter-city bus scheduling for allied carriers [J].
Chen, Chia-Hung ;
Yan, Shangyao ;
Tseng, Chih-Hwang .
TRANSPORTMETRICA, 2010, 6 (03) :161-185