Small and Medium Enterprises' Solution to Improve On-Site Waste Management in Office Building Retrofit Projects

被引:0
作者
Li, Mei [1 ]
Yang, Jay [1 ]
Li, Qiming
机构
[1] Queensland Univ Technol, Fac Built Environm & Engn, Brisbane, Qld 4001, Australia
来源
PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3 | 2010年
关键词
office building; retrofit; waste management; sustainability; SMES;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Office building retrofit projects are increasingly more intensified as existing buildings are aging. At the same time, building owners and occupants are looking for environmentally sustainable products. These retrofit projects usually take place in center business district (CBDs) with on-site waste becoming one of the critical issues. Small and Medium Enterprises (SMEs) carry out most of the work in retrofit projects as subcontractors. Despite their large involvement, they often do not have adequate resources to deal with the specific technical challenges and project risks related to waste. Few research has been done on their performance of waste management operations. This paper identifies characteristics of on-site waste in office building retrofit projects. It examines the specific requirements for contractors to manage waste in the projects before exploring the existing performance of SMEs. By comparing requirements for SMEs and their potential areas for improvement, a framework is established for performance promotion of SMEs in on-site waste management of office building retrofit projects. The paper will raise the consciousness and commitment of SMEs as sub-contractors to waste management. It also explores ways of supporting SMEs for experience accumulation, performance promotion and project culture establishment towards effective and efficient on-site waste management in the growing sector of office building retrofit and upgrade.
引用
收藏
页码:162 / 166
页数:5
相关论文
共 24 条
[1]  
ACC, 2007, BUILD REF GUID
[2]  
BFM BRE, 2004, EV MARK DEV POT WAST
[3]  
Briscoe G., 2001, Eur. J. Purch. Supply Manag, V7, P243, DOI [10.1016/S0969-7012(01)00005-3, DOI 10.1016/S0969-7012(01)00005-3]
[4]   Intelligent environmental management for SMEs in manufacturing [J].
Burke, Stephen ;
Gaughran, W. F. .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2006, 22 (5-6) :566-575
[5]  
Condon L., 2004, Australian Journal of Environmental Education, V20, P57, DOI DOI 10.1017/S0814062600002305
[6]  
Dulung A.Z., 2005, ARCHIT SCI REV, V48, P93, DOI DOI 10.3763/ASRE.2005.4812
[7]  
Egbu C.O., 1999, CONSTRUCTION MANAGEM, V17, P29, DOI DOI 10.1080/014461999371808
[9]  
Gardner G.T., 1996, ENV PROBLEMS HUMAN B
[10]  
GEOFFREY B, 2005, SUPPLY CHAIN MANAGEM, V10