共 37 条
- [32] Flare Minimization of Ethylene Plant Start-up via Resource-Task Network Approach 12TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING AND 25TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PT C, 2015, 37 : 1871 - 1876
- [33] Operating Experience with More than 1000 Start-ups of the 300 MW Peak Load Power Plant of GKM. VGB-Kraftwerkstechnik, 1981, 61 (04): : 279 - 284