The Risk Assessment and Control Technology to Engineering Schedule

被引:0
|
作者
Wang Xiao-yan [1 ]
Liang Ting [1 ]
Fan Shao-Yan [2 ]
机构
[1] Changan Univ, Sch Civil Engn, Xian, Peoples R China
[2] Northwest Univ Xian, Coll Urban & Environm Sci, Xian, Peoples R China
来源
HIGH PERFORMANCE STRUCTURES AND MATERIALS ENGINEERING, PTS 1 AND 2 | 2011年 / 217-218卷
关键词
engineering construction; scheduled plan; indeterminacy factors; risk assessment; risk control;
D O I
10.4028/www.scientific.net/AMR.217-218.268
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
The progress of construction projects in the plan are generally based on engineering theory and construction developed on the basis of experience. In addition, The schedule impact on the political and economic situation, resources, technology development and other factors. So progress has a great uncertainty. Once the delay period to the owner and construction unit will be a great deal of risk, so risk control of the progress it is essential. This article describes the uncertainty factors about affect on schedule and progress against these uncertainties should be how to control and progress of risk response.
引用
收藏
页码:268 / +
页数:3
相关论文
共 50 条
  • [41] Risk assessment on subway tunnel engineering during construction process
    Wang, Jing
    Tan, Yue-Hu
    Wang, Peng-Fei
    Jiang, Wei
    Jiefangjun Ligong Daxue Xuebao/Journal of PLA University of Science and Technology (Natural Science Edition), 2009, 10 (04): : 379 - 383
  • [42] Research on Methods of Technology Risk and Quality Risk Assessment for Development of Aviation Equipments
    Wang Bangjun
    CHINESE PERSPECTIVE ON RISK ANALYSIS AND CRISIS RESPONSE, 2010, 13 : 487 - 496
  • [43] Harnessing BIM with risk assessment for generating automated safety schedule and developing application for safety training
    Singh, Shail Pratap
    Mansuri, Lukman E.
    Patel, D. A.
    Chauhan, Suman
    SAFETY SCIENCE, 2023, 164
  • [44] Power Grid Risk Assessment Method Based on Risk Probability Engineering and Its Application
    Liu, Sha
    Shi, Xiaoqiang
    Wang, Tianhua
    Zhang, Yuan
    Cao, Yankun
    2016 IEEE INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2016,
  • [45] Fermentation and pathogen control: a risk assessment approach
    Adams, M
    Mitchell, R
    INTERNATIONAL JOURNAL OF FOOD MICROBIOLOGY, 2002, 79 (1-2) : 75 - 83
  • [46] Progress in risk assessment for classical biological control
    Barratt, B. I. P.
    Howarth, F. G.
    Withers, T. M.
    Kean, J. M.
    Ridley, G. S.
    BIOLOGICAL CONTROL, 2010, 52 (03) : 245 - 254
  • [47] Risk assessment: an approach to control hazards in mines
    Shis Bhattacherjee
    中国安全生产科学技术, 2014, 10(S1) (S1) : 129 - 135
  • [48] Study on Risk Analysis and Control Technology of Coal Bump
    Pang, Xufeng
    Jiang, Yaodong
    Zhao, Yixin
    Zhu, Jie
    2011 INTERNATIONAL CONFERENCE OF ENVIRONMENTAL SCIENCE AND ENGINEERING, VOL 12, PT B, 2012, 12 : 831 - 836
  • [49] Study on Risk Analysis and Control Technology of Coal Bump
    Pang, Xufeng
    Jiang, Yaodong
    Zhao, Yixin
    Zhu, Jie
    2011 INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS AND NEURAL COMPUTING (FSNC 2011), VOL II, 2011, : 307 - 310
  • [50] Fire risk assessment of Kashan's commercial and shopping centers using fire risk assessment method for engineering (FRAME)
    Rabiei, Hadiseh
    Zare, Asma
    Taheri, Somayeh Ahmadian
    Ebrahimi, Niloofar
    Tehrani, Ashraf Mazaheri
    Malakoutikhah, Mahdi
    FIRE AND MATERIALS, 2024, 48 (05) : 536 - 541