The Risk Assessment and Control Technology to Engineering Schedule

被引:0
|
作者
Wang Xiao-yan [1 ]
Liang Ting [1 ]
Fan Shao-Yan [2 ]
机构
[1] Changan Univ, Sch Civil Engn, Xian, Peoples R China
[2] Northwest Univ Xian, Coll Urban & Environm Sci, Xian, Peoples R China
来源
HIGH PERFORMANCE STRUCTURES AND MATERIALS ENGINEERING, PTS 1 AND 2 | 2011年 / 217-218卷
关键词
engineering construction; scheduled plan; indeterminacy factors; risk assessment; risk control;
D O I
10.4028/www.scientific.net/AMR.217-218.268
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
The progress of construction projects in the plan are generally based on engineering theory and construction developed on the basis of experience. In addition, The schedule impact on the political and economic situation, resources, technology development and other factors. So progress has a great uncertainty. Once the delay period to the owner and construction unit will be a great deal of risk, so risk control of the progress it is essential. This article describes the uncertainty factors about affect on schedule and progress against these uncertainties should be how to control and progress of risk response.
引用
收藏
页码:268 / +
页数:3
相关论文
共 50 条
  • [31] Application of the Fuzzy Entropy Weight in Risk Assessment of the Engineering Project
    Wu, Xuyan
    Gu, Huiling
    Hu, Xujie
    Dong, Yuhong
    FIFTH INTERNATIONAL CONFERENCE ON INFORMATION ASSURANCE AND SECURITY, VOL 1, PROCEEDINGS, 2009, : 145 - +
  • [32] Information Security Risk Assessment Technology of Cyberspace: a Review
    Li Qianmu
    Zhang Hong
    INFORMATION-AN INTERNATIONAL INTERDISCIPLINARY JOURNAL, 2012, 15 (11A): : 4677 - 4683
  • [33] Operational Risk Assessment of Engineering Vehicles Considering Driver Characteristics
    Qi, Shouming
    Teng, Jun
    Zhang, Xi
    Zheng, Ao
    APPLIED SCIENCES-BASEL, 2024, 14 (12):
  • [34] Risk assessment of Australian construction and engineering firms in Chinese market
    Wang, Xiaoming
    Pham, Lam
    Fang, Dongping
    PROCEEDINGS OF CRIOCM 2007 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1 AND 2, 2007, : 412 - 423
  • [35] Engineering of Xinjiang Non Electricity Area and the Project Risk Assessment
    Huang, Yuansheng
    Jia, Chunyan
    INFORMATION TECHNOLOGY APPLICATIONS IN INDUSTRY II, PTS 1-4, 2013, 411-414 : 2537 - 2541
  • [36] The risk assessment model of BT construction engineering project financing
    Luo Fu-zhou
    Gao Hong-yuan
    ENGINEERING AND RISK MANAGEMENT, 2011, 1 : 169 - 173
  • [37] Applications of machine learning methods for engineering risk assessment - A review
    Hegde, Jeevith
    Rokseth, Borge
    SAFETY SCIENCE, 2020, 122
  • [38] THE RISK ASSESSMENT OF THE LONG-DISTANCE OIL PIPELINE ENGINEERING
    Wang Jinghua
    Mu Congru(Institute of Geography
    The Journal of Chinese Geography, 1996, (01) : 78 - 83
  • [39] Systems Engineering Based Model for Risk Assessment: a Case Study
    Li, C. H.
    Pretorius, L.
    IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 1335 - +
  • [40] Study on Risk Assessment and Measures for Linear Engineering in Cold Regions
    Huang Ming-kui
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 42 - 46