The Risk Assessment and Control Technology to Engineering Schedule

被引:0
|
作者
Wang Xiao-yan [1 ]
Liang Ting [1 ]
Fan Shao-Yan [2 ]
机构
[1] Changan Univ, Sch Civil Engn, Xian, Peoples R China
[2] Northwest Univ Xian, Coll Urban & Environm Sci, Xian, Peoples R China
来源
HIGH PERFORMANCE STRUCTURES AND MATERIALS ENGINEERING, PTS 1 AND 2 | 2011年 / 217-218卷
关键词
engineering construction; scheduled plan; indeterminacy factors; risk assessment; risk control;
D O I
10.4028/www.scientific.net/AMR.217-218.268
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
The progress of construction projects in the plan are generally based on engineering theory and construction developed on the basis of experience. In addition, The schedule impact on the political and economic situation, resources, technology development and other factors. So progress has a great uncertainty. Once the delay period to the owner and construction unit will be a great deal of risk, so risk control of the progress it is essential. This article describes the uncertainty factors about affect on schedule and progress against these uncertainties should be how to control and progress of risk response.
引用
收藏
页码:268 / +
页数:3
相关论文
共 50 条
  • [21] Novel method for schedule risks assessment in construction projects from perspective of risk chain
    Cao, Jiming
    Shen, Liangfa
    Peng, Wei
    Ma, Teng
    Tongji Daxue Xuebao/Journal of Tongji University, 2015, 43 (03): : 468 - 474
  • [22] Risk Evaluation Model for Information Technology Services in Integrated Risk Assessment
    Matsumura, Noriaki
    Nishigaki, Masakatsu
    Hasegawa, Takahiro
    ENGINEERING FOR SUSTAINABLE FUTURE, 2020, 101 : 318 - 325
  • [23] Technology of Space Lab Risk Identification and Control
    Yang H.
    Zhou H.-C.
    Yuhang Xuebao/Journal of Astronautics, 2019, 40 (03): : 295 - 301
  • [24] Risk assessment and control of underwater explosive damage to concrete gravity dams
    Huo, Wenlong
    Wang, Xiaohua
    Guan, Jing
    Zhang, Shilei
    KSCE JOURNAL OF CIVIL ENGINEERING, 2025, 29 (01)
  • [25] Risk assessment methodology for Underground Coal Gasification technology
    Zagorscak, Renato
    Metcalfe, Richard
    Limer, Laura
    Thomas, Hywel
    An, Ni
    Bond, Alex
    Watson, Sarah
    JOURNAL OF CLEANER PRODUCTION, 2022, 370
  • [26] Network & Information System Security Risk Assessment Technology
    Yao Ye
    Cai Wandong
    Fang Nan
    2016 13TH INTERNATIONAL BHURBAN CONFERENCE ON APPLIED SCIENCES AND TECHNOLOGY (IBCAST), 2016, : 397 - 401
  • [27] GEO-INFORMATION TECHNOLOGY FOR DISASTER RISK ASSESSMENT
    Cosic, Dorde
    Popov, Srdan
    Sakulski, Dusan
    Pavlovic, Ana
    ACTA GEOTECHNICA SLOVENICA, 2011, 8 (01): : 65 - 74
  • [28] XR technology and risk assessment: The future of probation training?
    Meenaghan, Amy
    Mcdermott, Michelle
    Haggar, Laura
    CRIMINOLOGY & CRIMINAL JUSTICE, 2023,
  • [29] The risk assessment of virtual high-technology enterprise
    Yang, Q
    Wang, Z
    Pan, A
    Fourth Wuhan International Conference on E-Business: The Internet Era & The Global Enterprise, Vols 1 and 2, 2005, : 889 - 893
  • [30] A Novel Risk Assessment Technology Based On ALARP Criterion
    Guan, Liang
    Jiao, Jian
    59TH ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM (RAMS), 2013,