The Risk Assessment and Control Technology to Engineering Schedule

被引:0
|
作者
Wang Xiao-yan [1 ]
Liang Ting [1 ]
Fan Shao-Yan [2 ]
机构
[1] Changan Univ, Sch Civil Engn, Xian, Peoples R China
[2] Northwest Univ Xian, Coll Urban & Environm Sci, Xian, Peoples R China
来源
HIGH PERFORMANCE STRUCTURES AND MATERIALS ENGINEERING, PTS 1 AND 2 | 2011年 / 217-218卷
关键词
engineering construction; scheduled plan; indeterminacy factors; risk assessment; risk control;
D O I
10.4028/www.scientific.net/AMR.217-218.268
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
The progress of construction projects in the plan are generally based on engineering theory and construction developed on the basis of experience. In addition, The schedule impact on the political and economic situation, resources, technology development and other factors. So progress has a great uncertainty. Once the delay period to the owner and construction unit will be a great deal of risk, so risk control of the progress it is essential. This article describes the uncertainty factors about affect on schedule and progress against these uncertainties should be how to control and progress of risk response.
引用
收藏
页码:268 / +
页数:3
相关论文
共 50 条
  • [1] Probabilistic Risk Assessment Applied to Maintenance Schedule of HVDC
    Wang, Tao
    Guan, Lin
    2014 INTERNATIONAL CONFERENCE ON PROBABILISTIC METHODS APPLIED TO POWER SYSTEMS (PMAPS), 2014,
  • [2] Risk Assessment of Plan Schedule by Monte Carlo Simulation
    Kong, Zhaoni
    Zhang, Jianping
    Li, Chao
    Zheng, Xiaoying
    Guan, Qingqing
    PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND MANAGEMENT INNOVATION, 2015, 28 : 509 - 513
  • [3] Risk Assessment of Blockchain Technology
    Morganti, Giacomo
    Schiavone, Enrico
    Bondavalli, Andrea
    2018 EIGHTH LATIN-AMERICAN SYMPOSIUM ON DEPENDABLE COMPUTING (LADC), 2018, : 87 - 96
  • [4] Remediation technology and risk assessment
    Stefan Trapp
    Lise Samsøe-Petersen
    Journal of Soils and Sediments, 2003, 3 (4) : 253 - 253
  • [5] Research on risk assessment technology of industrial control system based on attack graph
    Zou, Zhenwan
    Wang, Di
    Yang, Huiting
    Hou, Yingsa
    Yang, Yandong
    Xu, Wenlu
    PROCEEDINGS OF 2018 IEEE 3RD ADVANCED INFORMATION TECHNOLOGY, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (IAEAC 2018), 2018, : 2420 - 2423
  • [6] Risk Assessment for Flood Control Engineering Using Fuzzy Theory: A Case Study in China
    Wang, Yuankun
    Wang, Dong
    Ma, Huiqun
    Wu, Jichun
    BEYOND EXPERIENCE IN RISK ANALYSIS AND CRISIS RESPONSE, 2011, 16 : 227 - 232
  • [7] Risk Assessment for a Flood Control Engineering System Using Fuzzy Theory: A Case in China
    Wang, Yuankun
    Wang, Dong
    Wu, Jichun
    Chen, Xi
    Ma, Huiqun
    Wang, Guizuo
    HUMAN AND ECOLOGICAL RISK ASSESSMENT, 2013, 19 (02): : 400 - 409
  • [8] A new risk assessment model for offshore engineering
    Li, Yan-Cang
    Suo, Juan-Juan
    PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2006, : 4197 - +
  • [9] Risk Assessment in Concurrent Engineering of Space Missions
    Sanchez, Antonio Harrison
    2024 ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, RAMS, 2024,
  • [10] Risk Assessment and Risk Control for Navigation Environment of Dock Waters adjacent to Fairway
    Yu Xun
    MATERIALS, TRANSPORTATION AND ENVIRONMENTAL ENGINEERING, PTS 1 AND 2, 2013, 779-780 : 1162 - 1165