Deviations in design of residential buildings

被引:0
作者
Shrivastava, Apurv [1 ]
Chaurasia, Devarshi [1 ]
Saxena, Shilpam [2 ]
机构
[1] Sch Planning & Architecture, Neelbad Rd, Bhopal 462030, India
[2] Oriental Coll Technol, Bhopal 462021, India
关键词
Design; Construction; Deviations; Buildings; Issues;
D O I
10.1016/j.matpr.2021.06.106
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
With the migration of labourers from cosmopolitan cities like Mumbai, New Delhi, Gurugram etc; there is a huge housing demand in these tier II cities. But these demands are difficult to meet, but still developers as well as government agencies deliver the projects. The main issues with these developers are delivering the project on time and cost. But due to the lots of change orders, these projects are not delivered on time. The change orders/deviations are the changes which we do in the design and construction stage. These changes are the design changes, construction methodology changes as well as changes related with material and workmanship issues. (c) 2020 Elsevier Ltd. All rights reserved. Selection and peer-review under responsibility of the scientific committee of the International Conference on Advances in Design, Materials and Manufacturing.
引用
收藏
页码:7050 / 7053
页数:4
相关论文
共 14 条
[1]  
ABDUL-KADIR M., 1995, INT J PROJ MANAG, V13, P387, DOI 10.1016/0263-7863(96)81776-5
[2]  
Alaryan A., 2014, International Journal of Engineering Research and Applications, V1, P1
[3]  
[Anonymous], 2004, GUID PROJ MAN BOD KN, P113
[4]   CONSTRUCTION CLAIMS - FREQUENCY AND SEVERITY [J].
DIEKMANN, JE ;
NELSON, MC .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1985, 111 (01) :74-81
[5]  
Fisher S.D, 1999, J MANAGE ENG
[6]  
Josephson P.E, CAUSES COSTS DEFECTS, P479
[7]  
Mbamali I, 2012, AM INT J CONT RES
[8]  
Mydin SH, 2011, INT J SUSTAIN CONSTR, V2, P24
[9]  
Shrivastava A, 2016, APPL HUMAN FACTORS E, P1209
[10]  
Soderlund J., 2004, International Journal of Project Management, V22, P183, DOI 10.1016/S0263-7863(03)00070-X