共 22 条
[1]
ABUDAYYEH OY, 1993, J COMPUT CIVIL ENG, V7, P181, DOI DOI 10.1061/(ASCE)0887-3801(1993)7:2(181)
[2]
ASHLEY DB, 1977, J CONSTRUCT DIV-ASCE, V103, P369
[3]
Bathurst P. E., 1980, BUILDING COST CONTRO
[4]
CARR RI, 1991, PREPARING FOR CONSTRUCTION IN THE 21ST CENTURY, P687
[5]
COST, SCHEDULE, AND TIME VARIANCES AND INTEGRATION
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1993, 119 (02)
:245-265
[6]
CARR RI, 1983, P C CURR PRACT COST, P61
[7]
Chen H.L, 2002, THESIS U FLORIDA GAI
[8]
CHEN HL, 2000, P 1M INT S AUT ROB C, P659
[9]
FAYEK A, 2001, COST ENG, V43, P22
[10]
Kenley R., 1986, CONSTRUCTION MANAGEM, V4, P213, DOI DOI 10.1080/01446198600000017