Micro-scale mechanism of sealed water seepage and thickening from tailings bed in rake shearing thickener

被引:58
作者
Jiao, Huazhe [1 ]
Wu, Yachuang [1 ]
Wang, Hui [1 ]
Chen, Xinming [1 ]
Li, Zhen [1 ]
Wang, Yunfei [1 ]
Zhang, Boyang [1 ]
Liu, Juanhong [2 ]
机构
[1] Henan Polytech Univ, Sch Civil Engn, Int Joint Res Lab Henan Prov Underground Space De, Jiaozuo 454000, Henan, Peoples R China
[2] Univ Sci & Technol Beijing, Civil & Resource Engn Sch, Beijing 100000, Peoples R China
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
Paste and thickened tailings; Three-dimensional reconstruction; Connected pore structure; Seepage flow channel; Channel blockage; CEMENTED PASTE BACKFILL; PORE STRUCTURE; BEHAVIOR; CONSOLIDATION; FLOCCULATION; SIMULATION; SAFETY; WASTE; FLUID;
D O I
10.1016/j.mineng.2021.107043
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Paste and Thickened Tailings (PTT) technology has the advantages of water-saving, dam safety, and environmentally friendly, which can improve tailings disposal and backfill operation. In the process of thickening preparation, the ultra-fine tailings particles are prone to form suspended water-locking flocs, which are severely detrimental to the underflow concentration improvement in the thickener. This study focuses on the deep cone thickener underflow density improvement. The high-precision CT scanning and three-dimensional reconstruction technology were used to explore the pore structure shear evolution to enhance underflow slurry dewatering behavior and reveal the thickening mechanism. Results show that when the shearing rate of the rake is two revolutions per minute (rpm), the concentration of tailings underflow rises from 59.2% wt to 68.5% wt, increases by 15.71%. The rake shearing breaks the pore structure of the flocs network, the pores quantity increases and the porosity decreases by 21.74%. After shearing, suspended particles fill the pores, the pore connectivity decreases by 26.74%, the absolute permeability decreases by 31.35%, the sealed pore water is discharged, and the bed slurry can be thickened. The study can improve the utilization rate of tailings (from classified tailings to whole tailings), make the thickening process going deep(raising high concentration slurry to paste slurry), and increase the backfill capacity (backfill underground goaf in time), so as to effectively reduce the tailing pond and goaf quantity.
引用
收藏
页数:10
相关论文
共 71 条
[1]  
Alp I, 2009, IRAN J SCI TECHNOL B, V33, P291
[2]  
[Anonymous], 2018, MINER ENG
[3]  
[Anonymous], 2019, J HYDROL
[4]  
[Anonymous], 2021, J HAZARD MATER
[5]   Load-settlement behaviour of a strip footing resting on iron ore tailings as a structural fill [J].
Atta, Kuranchie Francis ;
Kumar, Shukla Sanjay ;
Daryoush, Habibi ;
Monir, Kazi .
INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2016, 26 (02) :247-253
[6]   Effects of polyethylenimine dosages and molecular weights on flocculation, rheology and consolidation behaviors of kaolin slurries [J].
Avadiar, Lavanya ;
Leong, Yee-Kwong ;
Fourie, Andy .
POWDER TECHNOLOGY, 2014, 254 :364-372
[7]  
Azzopardi B. J., 2017, P I MECH ENG C-J MEC, V1989
[8]   Amylopectin-graft-polyacrylamide for the flocculation and dewatering of oil sands tailings [J].
Bazoubandi, Behnaz ;
Soares, Joao B. P. .
MINERALS ENGINEERING, 2020, 148
[9]   Numerical modeling of fluid and electrical currents through geometries based on synchrotron X-ray tomographic images of reservoir rocks using Avizo and COMSOL [J].
Bird, M. B. ;
Butler, S. L. ;
Hawkes, C. D. ;
Kotzer, T. .
COMPUTERS & GEOSCIENCES, 2014, 73 :6-16
[10]   Effect of Filling Interval Time on Long-Term Mechanical Strength of Layered Cemented Tailing Backfill [J].
Cao, Shuai ;
Song, Wei-dong .
ADVANCES IN MATERIALS SCIENCE AND ENGINEERING, 2016, 2016