Evolutionary Game Dynamics for Financial Risk Decision-Making in Global Supply Chain

被引:8
作者
Li, Zhi [1 ,2 ]
Jin, Guanghao [3 ]
Duan, Shen [1 ]
机构
[1] Tianjin Polytech Univ, Sch Econ & Management, Tianjin 300387, Peoples R China
[2] Tianjin Univ, Coll Management & Econ, Tianjin 300072, Peoples R China
[3] Tianjin Polytech Univ, Sch Comp Sci & Software Engn, Tianjin 300387, Peoples R China
关键词
MANAGEMENT; MODEL; PERSPECTIVE;
D O I
10.1155/2018/9034658
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
This paper focuses on the game evolution process and its influencing factors of financial risk cooperation behavior between suppliers and manufacturers in global supply chain system. Using two-population evolutionary game theory, the performance of supply chain members under financial risk environment is modeled. Further, the proposed financial risk game model is applied to simulation cases of global supply chain. Based on the theory analysis and simulation results, it is shown that the cooperation strategy is the optimal evolutionarily stable strategy (ESS) for all supply chain members, when facing the high financial risk. The financial risk-sharing coefficient can be regarded as an adjuster that affects risk ESS of both suppliers and manufacturers under the low financial risk setting. By reducing the financial risk-sharing ratio of one supply chain player, his intention of adopting cooperation strategy would be enhanced. Finally, it is observed that financial risk sharing approach may lead to the alignment among supply chain members. Therefore, setting up an effective financial risk-sharing mechanism is beneficial to realize sustainable development of global supply chain.
引用
收藏
页数:10
相关论文
共 25 条
  • [1] [Anonymous], 1998, EVOLUTIONARY GAMES P
  • [2] Integrated supply chain risk management via operational methods and financial instruments
    Bandaly, Dia
    Satir, Ahmet
    Shanker, Latha
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (07) : 2007 - 2025
  • [3] Does finance solve the supply chain financing problem?
    Caniato, Federico
    Gelsomino, Luca Mattia
    Perego, Alessandro
    Ronchi, Stefano
    [J]. SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2016, 21 (05) : 534 - 549
  • [4] Integrating financial risk measures into the design and planning of closed-loop supply chains
    Cardoso, Sonia R.
    Barbosa-Povoa, Ana Paula
    Relvas, Susana
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2016, 85 : 105 - 123
  • [5] Nash equilibrium solution in a vendor-buyer supply chain model with permissible delay in payments
    Chern, Maw-Sheng
    Chan, Ya-Lan
    Teng, Jinn-Tsair
    Goyal, Suresh Kumar
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2014, 70 : 116 - 123
  • [6] Supply chain risk management: the lessons learned from the Egyptian revolution 2011
    Elzarka, Sara M.
    [J]. INTERNATIONAL JOURNAL OF LOGISTICS-RESEARCH AND APPLICATIONS, 2013, 16 (06) : 482 - 492
  • [7] Supply risk sharing in a closed-loop supply chain
    He, Yuanjie
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2017, 183 : 39 - 52
  • [8] Huff J., 2015, SUPPLY CHAIN FORUM, P4, DOI DOI 10.1080/16258312.2015.11716348
  • [9] Huner D., 2014, IND ENG, V46, P32
  • [10] Developing green purchasing relationships for the manufacturing industry: An evolutionary game theory perspective
    Ji, Ping
    Ma, Xin
    Li, Gang
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 166 : 155 - 162