Research on life cycle environmental impact assessment and decision analysis model of building materials based on BIM

被引:0
作者
Zhang, Jie [1 ]
Liu, Tingting [1 ]
Hu, Xinmin [1 ]
机构
[1] Anhui Xinhua Univ, Key Lab Bldg Struct, Anhui Higher Educ Inst, Hefei 230088, Peoples R China
来源
2ND INTERNATIONAL CONFERENCE ON APPLIED MATHEMATICS, MODELLING, AND INTELLIGENT COMPUTING (CAMMIC 2022) | 2022年 / 12259卷
关键词
Building Information Modeling; Life Cycle Assessment; environmental impact assessment; decision making; FRAMEWORK;
D O I
10.1117/12.2638764
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
According to the idea of life cycle assessment, taking the floor of a building as the object, this paper uses BIM technology and tools to build a multi-dimensional information model of the construction project, further defines the relationship between BIM model elements and building materials, and quantifies the environmental impact of building materials. Through the classification, characterization, standardization and weighted evaluation of the results generated by the BIM-LCA function module (Tally), the impact potential of different environmental impact types in each stage and the environmental impact size of the same environmental impact type in different stages are obtained. The analytic hierarchy process is used to establish the environmental impact assessment index database of construction projects in order to measure the feasibility of construction projects.
引用
收藏
页数:8
相关论文
共 10 条
[1]   Technology adoption in the BIM implementation for lean architectural practice [J].
Arayici, Y. ;
Coates, P. ;
Koskela, L. ;
Kagioglou, M. ;
Usher, C. ;
O'Reilly, K. .
AUTOMATION IN CONSTRUCTION, 2011, 20 (02) :189-195
[2]   Developing a framework for sustainable development indicators for the mining and minerals industry [J].
Azapagic, A .
JOURNAL OF CLEANER PRODUCTION, 2004, 12 (06) :639-662
[3]  
Bribian I. Z., 2010, AUTOMAT CONSTR, V19, P988
[4]   A BIM-based system for demolition and renovation waste estimation and planning [J].
Cheng, Jack C. P. ;
Ma, Lauren Y. H. .
WASTE MANAGEMENT, 2013, 33 (06) :1539-1551
[5]   A conceptual framework to support solar PV simulation using an open-BIM data exchange standard [J].
Gupta, Apeksha ;
Cemesova, Alexandra ;
Hopfe, Christina J. ;
Rezgui, Yacine ;
Sweet, Tracy .
AUTOMATION IN CONSTRUCTION, 2014, 37 :166-181
[6]  
HAN Ya-kun, 2018, J ENG MANAGEMENT, V32, P18
[7]  
Sawhney Anil, 2013, International Journal of Computer Information Systems and Industrial Management Applications, V5, P445
[8]  
Shen Lin, 2015, FOREST ENG, V31, P149
[9]  
so, ANAL HIERARCHY PROCE
[10]  
Xu Zhao, 2017, BIM BASED EVALUATION, P85