Remanufacturing of power transformers

被引:0
作者
Corsi, DE
机构
来源
NETA: Annual Technical Conference 2003: POWER SYSTEMS MAINTENANCE | 2003年
关键词
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The following paper will summarize the design considerations involved in the remanufacturing process. The main considerations involved in the redesign process will be discussed in general terms. The design process is critical in determining transformer reliability in service. A forensic study performed in the United Kingdom stated that 35% of transformer failures in the United Kingdom are due to design defects. [1] Given that a significant percentage of transformer failures have their root cause in design defects, the manufacturer's design philosophy, methods and approach are critical to in-service reliability.
引用
收藏
页码:353 / 358
页数:6
相关论文
共 7 条
[1]  
CORSI DE, 2002, C DOBL CLIENTS, P3
[2]  
Feinberg R., 1979, MODERN POWER TRANSFO
[3]  
GANSER R, 1992, ELECT TODAY, P21
[4]  
KARSAI K, 1987, LARGE POWER TRANSFOR, P187
[5]  
Moser H. P., 1979, SCI ELECT
[6]  
TEMPLETON J, 2001, POWER IND DEV, P37
[7]  
Wood D, 2000, POWER TRANSFORMER DE, P2