Maximizing Output During Ramp by Integrating Capacity and Velocity

被引:1
作者
Kalir, Adar A. [1 ,2 ]
Rozen, Kosta [1 ,2 ]
机构
[1] Intel Corp, Fab Sort Mfg, IL-82109 Qiriat Gat, Israel
[2] Ben Gurion Univ Negev, Ind Engn Dept, IL-8410501 Beer Sheva, Israel
关键词
Ramp; output; throughput; capacity; velocity; production cycle time; optimization; ENGINEERING PROCESS IMPROVEMENT; WAFER FABRICATION; TIME;
D O I
10.1109/TSM.2018.2835660
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In the semi-conductor industry, factories ramp their production capacity in parallel with tool (machine) installations. Ramp capacity, and subsequently wafer starts, are aligned with additional installs of the most expensive tool. Subsequently, starts arc set to the full capacity of that limiting toolset. In this paper, we argue that this may not be best method to maximize output over the ramp period and that by keeping ramp starts below constraint capacity, increased levels of cumulative output can be achieved for a desired planning horizon (e.g., the first year of production). A mathematical framework of the problem is provided to support our hypothesis, together with numerical examples and a set of simulation experiments.
引用
收藏
页码:327 / 334
页数:8
相关论文
共 18 条