A two-stage heuristic for the sequence-dependent job sequencing and tool switching problem

被引:10
|
作者
Rifai, Achmad Pratama [1 ]
Mara, Setyo Tri Windras [1 ]
Norcahyo, Rachmadi [1 ]
机构
[1] Univ Gadjah Mada, Fac Engn, Dept Mech & Ind Engn, Yogyakarta, Indonesia
关键词
Flexible manufacturing machine; Job sequencing and tool switching; Sequence-dependent setup time; Adaptive large neighborhood search; Simulated annealing; LARGE NEIGHBORHOOD SEARCH; ITERATED LOCAL SEARCH; HYBRID METHOD; MACHINE; OPTIMIZATION; MINIMIZATION; ALGORITHMS; SETUP; MODELS; NUMBER;
D O I
10.1016/j.cie.2021.107813
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The job sequencing and tool switching problem is a combinatorial optimization problem that commonly happens in a flexible manufacturing system environment. In this type of environment, a set of flexible manufacturing machines can be configured with various tools to process different jobs and the requirement to switch tools may correspond to a reduction of productivity. Consequently, research on the job sequencing and tool switching problem has been concentrated on minimizing the number of tools switches. This paper discusses the sequencedependent job sequencing and tool switching problem. The sequence-dependent job sequencing and tool switching problem extends the standard model by considering non-uniform setup times since industrial applications indicate that a tool setup time might be influenced by the previously installed tool at the same magazine slot. A two-stage heuristic procedure is developed here. In the first stage, an adaptive large neighborhood search is deployed for finding the near-optimal job sequence. Then, in the second stage, a combination of the Keep Tool Needed Soonest policy and simulated annealing is proposed for the tooling sub-problem. Comprehensive computational experiments are carried out to demonstrate the efficacy and robustness of the proposed method for solving the sequence-dependent job sequencing and tool switching problem.
引用
收藏
页数:18
相关论文
共 50 条
  • [41] Scheduling job shop problems with sequence-dependent setup times
    Naderi, B.
    Zandieh, M.
    Ghomi, S. M. T. Fatemi
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (21) : 5959 - 5976
  • [42] Domino sequencing: Scheduling with state-based sequence-dependent setup times
    Diessel, Erik
    Ackermann, Heiner
    OPERATIONS RESEARCH LETTERS, 2019, 47 (04) : 274 - 280
  • [43] The single machine scheduling problem with sequence-dependent setup times and a learning effect on processing times
    Mustu, Settar
    Eren, Tamer
    APPLIED SOFT COMPUTING, 2018, 71 : 291 - 306
  • [44] Two-stage sequence generation for partial disassembly of products with sequence dependent task times
    Riggs, Robert J.
    Jin, Xiaoning
    Hub, S. Jack
    22ND CIRP CONFERENCE ON LIFE CYCLE ENGINEERING, 2015, 29 : 698 - 703
  • [45] A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times
    Krueger, Doreen
    Scholl, Armin
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 197 (02) : 492 - 508
  • [46] The high performing backtracking algorithm and heuristic for the sequence-dependent setup times flowshop problem with total weighted tardiness
    Zheng, Jun-Xi
    Zhang, Ping
    Li, Fang
    Du, Guang-Long
    ENGINEERING OPTIMIZATION, 2016, 48 (09) : 1571 - 1592
  • [47] On the feasibility of sequence-dependent economic lot scheduling problem
    Shirodkar, Vinay A.
    Pillai, V. Madhusudanan
    Sridharan, R.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (10) : 2925 - 2939
  • [48] A heuristic and meta-heuristic based on problem-specific knowledge for distributed blocking flow-shop scheduling problem with sequence-dependent setup times
    Zhao, Fuqing
    Bao, Haizhu
    Wang, Ling
    Xu, Tianpeng
    Zhu, Ningning
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2022, 116
  • [49] On the two-stage assembly flow shop problem
    Hadda, Hatem
    Dridi, Najoua
    Hajri-Gabouj, Sonia
    TOP, 2024, 32 (02) : 224 - 244
  • [50] Optimising the Slab Yard Planning and Crane Scheduling Problem using a two-stage heuristic
    Dohn, Anders
    Clausen, Jens
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (15) : 4585 - 4608