共 50 条
- [41] Comparative analysis of blasting disturbance under different hole arrangements in presplitting excavation of gentle slope of dam foundation Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2024, 46 (05): : 1018 - 1029
- [45] Test and analysis of an existing tunnel vibration induced by blasting construction of diaphragm wall Transactions of Tianjin University, 2008, 14 (SUPPL.): : 569 - 575
- [48] Ground Vibration Test and Dynamic Response of Horseshoe-shaped Pipeline During Tunnel Blasting Excavation in Pebbly Sandy Soil Geotechnical and Geological Engineering, 2020, 38 : 3725 - 3736