A Decision Model for Human Resource Allocation in Project Management of Software Development

被引:27
|
作者
Chiang, Hui Yi [1 ]
Lin, Bertrand M. T. [1 ]
机构
[1] Natl Chiao Tung Univ, Inst Informat Management, Hsinchu 30010, Taiwan
关键词
Software; Resource management; Task analysis; Project management; Companies; Computational modeling; Estimation; human resource allocation; team formation; software project; integer programming; JOB ASSIGNMENT; TIME; OPTIMIZATION; NETWORKS; COSTS; TASK;
D O I
10.1109/ACCESS.2020.2975829
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In project management, especially of software development, human resource allocation is critical not only for project success including timely delivery and products quality but also for cost estimation to a software company to decide to contract projects or not. Many approaches have been proposed to provide assistance for human resource allocation in view of minimizing project duration and project cost or maximizing revenue and efficiency. These approaches may sometimes not be comprehensive in real-world environments without addressing some key factors like transferring cost, communication, and negative efficiency, which usually have crucial impacts on assignment applicability. This article is proposing a framework for assisting a software company to evaluate existing resource for making decisions on whether the estimation of the tender is feasible, and assisting to make human resource allocation for team formation in fixed project duration with labor skill and budget constraint. Within consideration of both the cost and the efficiency, the performance is maximized to verges on the customers& x2019; expectations in software development project management on the basis of a real case. Before forming a team for a specific project with well-defined periods and numbers of people with different project roles, the values of key factors in the framework are calculated with individual foundation of computation. We formulate the decision process in integer programming models, and a simulation study is conducted to demonstrate the applicability of the proposed model to assist the decision making process of software companies for team formation. The results of four variants for maximum skill efficiency or minimum hiring cost are illustrated with different considerations of both key factors are included or not proposed in this paper, and demonstrate that these factors could bring out different sources to help companies in making further evaluations for allocating staff in a software development project.
引用
收藏
页码:38073 / 38081
页数:9
相关论文
共 50 条
  • [41] Effective project management for software development
    Jurison, J
    ASSOCIATION FOR INFORMATION SYSTEMS PROCEEDINGS OF THE AMERICAS CONFERENCE ON INFORMATION SYSTEMS, 1998, : 1126 - 1127
  • [42] Software project management maturity assessment model to assess software project management practices
    Fauzi, Shukor Sanim Bin Mohd
    Ramli, Nuraminah Bt
    ICCSA 2007: PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON COMPUTATIONAL SCIENCE AND APPLICATIONS, 2007, : 375 - +
  • [43] MANAGING MANAGEMENT MANPOWER - MODEL FOR HUMAN RESOURCE DEVELOPMENT
    HAIRE, M
    BUSINESS HORIZONS, 1967, 10 (04) : 23 - 28
  • [44] Decision-making support system for human resource allocation in product development projects
    Yoshimura, M
    Fujimi, Y
    Izui, K
    Nishiwaki, S
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (05) : 831 - 848
  • [45] Earned value project management of model-centric software development
    Li Jin-hua
    Wei Chang-jiang
    Li Jing
    Li Qiong
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 12694 - 12697
  • [46] The SD Model of Process Management of The Software Development Project and Its Simulation
    Jia Xiaojing
    PROCEEDINGS OF THE 15TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A-C, 2008, : 2004 - 2007
  • [47] Software Project Management in Distributed Software Development Context
    Calvi Tait, Tania Fatima
    Moriya Huzita, Elisa Hatsue
    ICEIS: PROCEEDINGS OF THE 15TH INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS - VOL 2, 2013, : 216 - 222
  • [48] Multi-dimensional Model Method for the Human Resource Allocation in Multi-project
    Chen Junjie
    Yun Chuxiu
    Wang Zhen
    2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 4, PROCEEDINGS, 2009, : 364 - +
  • [49] Decision support software to optimize resource allocation - Theory and case history
    Deschaine, LM
    Breslau, B
    Ades, MJ
    Selg, R
    Saaty, TL
    PROCEEDINGS OF THE SIMULATORS INTERNATIONAL XV, 1998, 30 (03): : 139 - 144
  • [50] The Role of the Human Resource in Project Management
    Padlowska, Anna
    EDUCATION EXCELLENCE AND INNOVATION MANAGEMENT THROUGH VISION 2020, 2019, : 9193 - 9202