Global Divergence in Nuclear Power Plant Construction: The Role of Political Decentralization

被引:2
|
作者
Benson, Andrew G. [1 ]
机构
[1] Sandia Natl Labs, POB 5800, Albuquerque, NM 87185 USA
关键词
Economics; construction; lead time; politics; decentralization; FISCAL DECENTRALIZATION; EFFICIENCY EVIDENCE; COST OVERRUNS; STANDARDIZATION; RISK; MEGAPROJECTS; MANAGEMENT; INNOVATION; PROJECTS; REACTORS;
D O I
10.1080/00295450.2021.1991762
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
Lead time-the duration of construction and commissioning-is an important determinant of the capital cost of nuclear power plants (NPPs). For an industry dominated by a handful of multinational firms, the degree of cross-national variation is surprising. NPP lead times have historically trended upward over time in Western nations, and yet they are comparatively quick and stable in East Asia. I theorize that the institutional capacity and autonomy of subnational governments can partially explain these patterns in the data. Having assembled a novel data set on the design specifications of the global population of NPPs, I empirically document a positive association between political decentralization and NPP lead time that is not explained by observed cross-country differences in NPP design. The results are suggestive of the hypothesis that political decentralization creates conditions that slow NPP construction for nontechnical reasons. However, the findings are not robust to certain robustness checks and fail to rule out the possibility that unobserved differences in design explain this association.
引用
收藏
页码:947 / 989
页数:43
相关论文
共 50 条
  • [21] Technical Evaluation Method of Mechanical Equipment Item Substitution in the Procurement and Construction Process of Nuclear Power Plant
    Zhang, Jindong
    Wu, Chongzhi
    JOURNAL OF NUCLEAR ENGINEERING AND RADIATION SCIENCE, 2023, 9 (01):
  • [22] A novel approach for occupational health and safety and environment risk assessment for nuclear power plant construction project
    Sui, Yang
    Ding, Rui
    Wang, Hanqing
    JOURNAL OF CLEANER PRODUCTION, 2020, 258
  • [23] International Project Risk Management for Nuclear Power Plant (NPP) Construction: Featuring Comparative Analysis with Fossil and Gas Power Plants
    Kim, Min
    Lee, Ikhaeng
    Jung, Youngsoo
    SUSTAINABILITY, 2017, 9 (03):
  • [24] Use of budget- and process-based planning in the course of nuclear power plant units construction
    Kurakova, Oksana
    INTERNATIONAL SCIENCE CONFERENCE SPBWOSCE-2016 - SMART CITY, 2017, 106
  • [25] Chromosome Aberrations in Nuclear Power Plant Workers
    Griciene, Birute
    Slapsyte, Grazina
    Mierauskiene, Jurate
    RAPID DIAGNOSIS IN POPULATIONS AT RISK FROM RADIATION AND CHEMICALS, 2010, 73 : 115 - 121
  • [26] Global politics and empty signifiers: the political construction of high technology
    Wullweber, Joscha
    CRITICAL POLICY STUDIES, 2015, 9 (01) : 78 - 96
  • [27] A framework for the selection of the right nuclear power plant
    Locatelli, Giorgio
    Mancini, Mauro
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (17) : 4753 - 4766
  • [28] Bayesian network analysis of safety culture and organizational culture in a nuclear power plant
    Garcia-Herrero, Susana
    Mariscal, M. A.
    Gutierrez, J. M.
    Toca-Otero, Antonio
    SAFETY SCIENCE, 2013, 53 : 82 - 95
  • [29] Power Requirements for the Construction and Operation of a Lunar Oxygen Plant
    Kanamori, H.
    Watanabe, T.
    Aoki, S.
    JOURNAL OF AEROSPACE ENGINEERING, 2013, 26 (01) : 160 - 168
  • [30] Integrated Cost and Schedule Control Systems for Nuclear Power Plant Construction: Leveraging Strategic Advantages to Owners and EPC Firms
    Jung, Youngsoo
    Moon, Byeong-Suk
    Kim, Yun-Myung
    Kim, Woojoong
    SCIENCE AND TECHNOLOGY OF NUCLEAR INSTALLATIONS, 2015, 2015