共 50 条
- [21] Analysis of Enterprise's Comprehensive Budget Management System Based on EVA 2016 6TH INTERNATIONAL CONFERENCE ON EDUCATION AND SPORTS EDUCATION (ESE 2016), PT 1, 2016, 51 : 301 - 304
- [22] The Study on Fuzzy Comprehensive Evaluation Model of Enterprise's Core Competence Based on BSC SECOND INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE AND DESIGN, VOL 2, PROCEEDINGS, 2009, : 457 - 460
- [23] Discussion on Building the Comprehensive Performance Evaluation System of Combining EVA and Balanced Score Card PROCEEDINGS OF THE 2015 3D INTERNATIONAL CONFERENCE ON ADVANCED INFORMATION AND COMMUNICATION TECHNOLOGY FOR EDUCATION, 2015, 11 : 351 - 355
- [24] The system design about performance management based on BSC PROCEEDINGS OF THE 2007 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, FINANCE ANALYSIS SECTION, 2007, : 1109 - 1115
- [25] A method of economic performance evaluation in ERP project for electric power enterprise based on DEA Proceedings of 2005 International Conference on Construction & Real Estate Management, Vols 1 and 2: CHALLENGE OF INNOVATION IN CONSTRUCTION AND REAL ESTATE, 2005, : 1421 - 1425
- [26] Research on Target Enterprise Value Evaluation Based on EVA Model - SEB M & a SUPOR PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT SCIENCE AND ECONOMICS (ICEMSE 2016), 2016, 65 : 456 - 459
- [27] Study on Enterprise Comprehensive Budget Management System Dynamic Framework Design Based on TRIZ and BSC PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT 2014, 2015, : 619 - 622
- [28] The design of government's reputation evaluation system based on BSC PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON PUBLIC ADMINISTRATION (3RD), VOL I, 2007, : 408 - 413
- [29] On constructing the performance measurement system of engineering projects based on the BSC PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON INNOVATION & MANAGEMENT, VOLS I AND II, 2007, : 2140 - 2144
- [30] The Improvement of Electric Power Enterprise Performance Management INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT (EBM2011), VOLS 1-6, 2011, : 363 - 366