A Data-Driven Bidding Model for a Cluster of Price-Responsive Consumers of Electricity

被引:49
作者
Saez-Gallego, Javier [1 ]
Morales, Juan M. [1 ]
Zugno, Marco [2 ]
Madsen, Henrik [1 ]
机构
[1] Tech Univ Denmark, DK-2800 Lyngby, Denmark
[2] Nordea, DK-1401 Copenhagen, Denmark
关键词
Smart grid; demand response; electricity markets; inverse optimization; bilevel programming; DEMAND RESPONSE; INVERSE OPTIMIZATION; ENERGY;
D O I
10.1109/TPWRS.2016.2530843
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper deals with the market-bidding problem of a cluster of price-responsive consumers of electricity. We develop an inverse optimization scheme that, recast as a bilevel programming problem, uses price-consumption data to estimate the complex market bid that best captures the price-response of the cluster. The complex market bid is defined as a series of marginal utility functions plus some constraints on demand, such as maximum pick-up and drop-off rates. The proposed modeling approach also leverages information on exogenous factors that may influence the consumption behavior of the cluster, e.g., weather conditions and calendar effects. We test the proposed methodology for a particular application: forecasting the power consumption of a small aggregation of households that took part in the Olympic Peninsula project. Results show that the price-sensitive consumption of the cluster of flexible loads can be largely captured in the form of a complex market bid, so that this could be ultimately used for the cluster to participate in the wholesale electricity market.
引用
收藏
页码:5001 / 5011
页数:11
相关论文
共 28 条
  • [11] Chance-Constrained Optimization of Demand Response to Price Signals
    Dorini, Gianluca
    Pinson, Pierre
    Madsen, Henrik
    [J]. IEEE TRANSACTIONS ON SMART GRID, 2013, 4 (04) : 2072 - 2080
  • [12] Complementarity problems in GAMS and the PATH solver
    Ferris, MC
    Munson, TS
    [J]. JOURNAL OF ECONOMIC DYNAMICS & CONTROL, 2000, 24 (02) : 165 - 188
  • [13] A REPRESENTATION AND ECONOMIC INTERPRETATION OF A 2-LEVEL PROGRAMMING PROBLEM
    FORTUNYAMAT, J
    MCCARL, B
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1981, 32 (09) : 783 - 792
  • [14] Halvgaard R., 2012, 2012 IEEE PES Innovative Smart Grid Technologies (ISGT), Washington DC, 16-20 January 2012, P1, DOI [10.1109/ISGT.2012.6175631, DOI 10.1109/ISGT.2012.6175631]
  • [15] Hammerstrom E. D. J., 2007, PACIFIC NW GRIDWIS 1
  • [16] Hastie T., 2009, The Elements of Statistical Learning: Data Mining, Inference and Prediction, V2, P1
  • [17] Keshavarz A, 2011, 2011 IEEE INTERNATIONAL SYMPOSIUM ON INTELLIGENT CONTROL (ISIC), P613, DOI 10.1109/ISIC.2011.6045410
  • [18] Li S., IEEE T POWE IN PRESS
  • [19] Luenberger DG, 2016, INT SER OPER RES MAN, V228, P1, DOI 10.1007/978-3-319-18842-3
  • [20] Madsen H., 2007, Time Series Analysis