INFLUENCE OF SPARE PARTS SERVICE MEASURES ON THE PERFORMANCE OF FRONT-END WAFER PRODUCTION PROCESS

被引:0
作者
Lamghari-Idrissi, Douniel [1 ]
Soellaart, Daniel [1 ]
Basten, Rob [1 ]
Dellaert, Nico [1 ]
机构
[1] Eindhoven Univ Technol, Sch Ind Engn, POB 513, Eindhoven 5600, Netherlands
来源
2019 WINTER SIMULATION CONFERENCE (WSC) | 2019年
关键词
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
We are interested in the influence of spare part service measures on the performance of front-end wafer fabrication process. This process is characterized by re-entrant flows exacerbating variability differences. We focus on the bottleneck resource. First, we simulate the spare part supply chain to show the impact of the spare part service measures on the time to repair distribution. Second, we use this distribution to assess the performance of the front-end wafer fabrication process. We conclude that the choice of the spare parts service measure has a high impact on the front-end wafer fabrication process performance. Our methodology could help practitioners making improved decisions regarding spare parts service measure.
引用
收藏
页码:2269 / 2280
页数:12
相关论文
共 50 条
[21]   The ALMA Front-end Archive Setup and Performance [J].
Wicenec, A. ;
Chen, A. ;
Checcucci, A. ;
Jeram, B. ;
Meuss, H. ;
Persson, A. ;
Burgos, P. ;
Cirami, R. .
ASTRONOMICAL DATA ANALYSIS SOFTWARE AND SYSTEMS XIX, 2010, 434 :457-+
[22]   Evaluation on the performance of a digital terrestrial front-end [J].
Yong, NT ;
Chee, LH ;
Jing, L ;
Guan, LF ;
Kiang, CC .
ICCE: 2005 INTERNATIONAL CONFERENCE ON CONSUMER ELECTRONICS, DIGEST OF TECHNICAL PAPERS, 2005, :167-168
[23]   Influence of the Gain-Bandwidth of the Front-End Amplifier on the Performance of a QEPAS Sensor [J].
Lombardi, Luigi ;
Matarrese, Gianvito ;
Marzocca, Cristoforo .
ACOUSTICS, 2024, 6 (01) :240-256
[24]   Performance of the ALICE PHOS front-end electronics [J].
Institute of Particle Physics, Central China Normal University, Wuhan 430079, China .
Kao Neng Wu Li Yu Ho Wu Li, 2006, 12 (1165-1170)
[25]   A Principal Factor of Performance in Decoupled Front-End [J].
Degawa, Yuya ;
Koizumi, Toru ;
Nakamura, Tomoki ;
Shioya, Ryota ;
Kadomoto, Junichiro ;
Irie, Hidetsugu ;
Sakai, Shuichi .
IEICE TRANSACTIONS ON INFORMATION AND SYSTEMS, 2023, E106D (12) :1960-1968
[26]   Implant and process challenges on the ITRS front-end process roadmap [J].
Larson, L ;
Huff, H .
SOLID STATE TECHNOLOGY, 2002, 45 (01) :32-34
[27]   Evaluation models for service oriented process in spare parts management [J].
Chen-Yang Cheng ;
Vittal Prabhu .
Journal of Intelligent Manufacturing, 2012, 23 :1403-1417
[28]   Evaluation models for service oriented process in spare parts management [J].
Cheng, Chen-Yang ;
Prabhu, Vittal .
JOURNAL OF INTELLIGENT MANUFACTURING, 2012, 23 (04) :1403-1417
[29]   A structured process for the fuzzy front-end of complex projects [J].
Zwikael, Ofer ;
Gilchrist, Alicia .
PRODUCTION PLANNING & CONTROL, 2024, 36 (07) :863-872
[30]   Modular front-end systems to reshape auto production [J].
Mapleston, P .
MODERN PLASTICS, 2000, 77 (04) :24-25