Double-Cycling AGV Scheduling Considering Uncertain Crane Operational Time at Container Terminals

被引:13
|
作者
Zhang, Hongchang [1 ]
Qi, Liang [1 ]
Luan, Wenjing [1 ]
Ma, Huijuan [2 ]
机构
[1] Shandong Univ Sci & Technol, Coll Comp Sci & Engn, Qingdao 266590, Peoples R China
[2] Qingdao New Qianwan Container Terminal Co Ltd, Qingdao 266500, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2022年 / 12卷 / 10期
基金
中国国家自然科学基金;
关键词
container terminals (CTs); automated guided vehicles (AGVs); hybrid particle swarm optimization (HPSO) algorithm; double-cycling; container scheduling sequence; QUAY CRANES; YARD; ALGORITHM; OPTIMIZATION; ASSIGNMENT; SEARCH;
D O I
10.3390/app12104820
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
Container terminals (CTs) play an important role in the modern logistics and transportation industry. The utilization of automated guided vehicles (AGVs) can be effectively facilitated by reducing their empty running. The existing strategies cannot guarantee the full load of AGVs during their transportation because of the complex constraints of container scheduling. This work proposes a double-cycling AGV scheduling model that ensures a full load of AGVs between the quayside and the yard. The objective is to minimize the total waiting time of AGVs and ensure a high loading rate of AGVs by scheduling loading/unloading containers. Furthermore, it takes the randomness of the quay crane's operational time into consideration. By assigning a time interval to AGVs' arrival at a quayside, a container scheduling sequence is obtained based on a Hybrid Particle Swarm Optimization (HPSO) algorithm with a penalty function. Via experiments, it shows that the proposed model can obtain the least number of AGVs for container transportation, minimize AGVs' total waiting time, and ensure the high loading rate of AGVs.
引用
收藏
页数:18
相关论文
共 50 条
  • [31] Scheduling of Different Automated Yard Crane Systems at Container Terminals
    Speer, Ulf
    Fischer, Kathrin
    TRANSPORTATION SCIENCE, 2017, 51 (01) : 305 - 324
  • [32] A polynomial-time heuristic for the quay crane double-cycling problem with internal-reshuffling operations
    Liu, Ming
    Chu, Feng
    Zhang, Zizhen
    Chu, Chengbin
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2015, 81 : 52 - 74
  • [33] Gantry Crane Scheduling with Interference Constraints in Railway Container Terminals
    Peng Guo
    Wenming Cheng
    Zeqiang Zhang
    Min Zhang
    Jian Liang
    International Journal of Computational Intelligence Systems, 2013, 6 : 244 - 260
  • [34] Optimization model and algorithm for quay crane scheduling in container terminals
    Qin, J. (qinjin@csu.edu.cn), 1600, Science Press (48):
  • [35] Optimal berth allocation, time-variant quay crane assignment and scheduling with crane setups in container terminals
    Turkogullari, Yavuz B.
    Taskin, Z. Caner
    Aras, Necati
    Altinel, I. Kuban
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 254 (03) : 985 - 1001
  • [36] Double-cycling strategies for container ships and their effect on ship loading and unloading operations
    Goodchild, Anne V.
    Daganzo, Carlos F.
    TRANSPORTATION SCIENCE, 2006, 40 (04) : 473 - 483
  • [37] Collaborative scheduling of handling equipment in automated container terminals with limited AGV-mates considering energy consumption
    Yang, Xurui
    Hu, Hongtao
    Cheng, Chen
    ADVANCED ENGINEERING INFORMATICS, 2025, 65
  • [38] An exact algorithm for scheduling tandem quay crane operations in container terminals
    Kong, Lingrui
    Ji, Mingjun
    Gao, Zhendi
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2022, 168
  • [39] Gantry crane scheduling in intermodal rail-road container terminals
    Guo, Peng
    Cheng, Wenming
    Wang, Yi
    Boysen, Nils
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (16) : 5419 - 5436
  • [40] Disruption recovery model for berth and quay crane scheduling in container terminals
    Zeng, Qingcheng
    Yang, Zhongzhen
    Hu, Xiangpei
    ENGINEERING OPTIMIZATION, 2011, 43 (09) : 967 - 983