Double-Cycling AGV Scheduling Considering Uncertain Crane Operational Time at Container Terminals

被引:13
|
作者
Zhang, Hongchang [1 ]
Qi, Liang [1 ]
Luan, Wenjing [1 ]
Ma, Huijuan [2 ]
机构
[1] Shandong Univ Sci & Technol, Coll Comp Sci & Engn, Qingdao 266590, Peoples R China
[2] Qingdao New Qianwan Container Terminal Co Ltd, Qingdao 266500, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2022年 / 12卷 / 10期
基金
中国国家自然科学基金;
关键词
container terminals (CTs); automated guided vehicles (AGVs); hybrid particle swarm optimization (HPSO) algorithm; double-cycling; container scheduling sequence; QUAY CRANES; YARD; ALGORITHM; OPTIMIZATION; ASSIGNMENT; SEARCH;
D O I
10.3390/app12104820
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
Container terminals (CTs) play an important role in the modern logistics and transportation industry. The utilization of automated guided vehicles (AGVs) can be effectively facilitated by reducing their empty running. The existing strategies cannot guarantee the full load of AGVs during their transportation because of the complex constraints of container scheduling. This work proposes a double-cycling AGV scheduling model that ensures a full load of AGVs between the quayside and the yard. The objective is to minimize the total waiting time of AGVs and ensure a high loading rate of AGVs by scheduling loading/unloading containers. Furthermore, it takes the randomness of the quay crane's operational time into consideration. By assigning a time interval to AGVs' arrival at a quayside, a container scheduling sequence is obtained based on a Hybrid Particle Swarm Optimization (HPSO) algorithm with a penalty function. Via experiments, it shows that the proposed model can obtain the least number of AGVs for container transportation, minimize AGVs' total waiting time, and ensure the high loading rate of AGVs.
引用
收藏
页数:18
相关论文
共 50 条
  • [21] A note on: a flexible crane scheduling methodology for container terminals
    Jiang Hang Chen
    Flexible Services and Manufacturing Journal, 2019, 31 : 34 - 40
  • [22] Robust Multistage Yard Crane Scheduling in Container Terminals
    Marx, Tobias
    Hartisch, Michael
    OPERATIONS RESEARCH PROCEEDINGS 2021, 2022, : 268 - 273
  • [23] An integrated scheduling method for AGV routing in automated container terminals
    Yang, Yongsheng
    Zhong, Meisu
    Dessouky, Yasser
    Postolache, Octavian
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 126 : 482 - 493
  • [24] An exact algorithm for multiple-equipment integrated scheduling in an automated container terminal using a double-cycling strategy
    Li, Yiming
    Sun, Zhuo
    Hong, Soondo
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2024, 186
  • [25] Simultaneous Load Scheduling of Quay Crane and Yard Crane in Port Container Terminals
    Lee, Der-Horng
    Cao, Zhi
    Chen, Jiang Hang
    Cao, Jin Xin
    TRANSPORTATION RESEARCH RECORD, 2009, (2097) : 62 - 69
  • [26] Yard crane scheduling to minimize total weighted vessel loading time in container terminals
    Shell Ying Huang
    Ya Li
    Flexible Services and Manufacturing Journal, 2017, 29 : 689 - 720
  • [27] Yard crane scheduling to minimize total weighted vessel loading time in container terminals
    Huang, Shell Ying
    Li, Ya
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2017, 29 (3-4) : 689 - 720
  • [28] A Hybrid Meta-Heuristic Approach for Solving Single-Vessel Quay Crane Scheduling with Double-Cycling
    Eldemir, Fahrettin
    Taner, Mustafa Egemen
    JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2025, 13 (02)
  • [29] Gantry Crane Scheduling with Interference Constraints in Railway Container Terminals
    Guo, Peng
    Cheng, Wenming
    Zhang, Zeqiang
    Zhang, Min
    Liang, Jian
    INTERNATIONAL JOURNAL OF COMPUTATIONAL INTELLIGENCE SYSTEMS, 2013, 6 (02) : 244 - 260
  • [30] Quay crane scheduling with handling priority in port container terminals
    Lee, Der-Horng
    Wang, Hui Qiu
    Miao, Lixin
    ENGINEERING OPTIMIZATION, 2008, 40 (02) : 179 - 189