Joint Optimization of Condition-Based Repair-by-Replacement and Spare Parts Provisioning Policy with Random Maintenance Time and Lead Time

被引:3
|
作者
Zhang, Xiao-hong [1 ]
Zeng, Jian-chao [1 ]
机构
[1] Taiyuan Univ Sci & Technol, Div Ind & Syst Engn, Taiyuan, Peoples R China
关键词
Joint optimization; Condition-based repair-by-replacement; (Ss) type spare provisioning policy; Repair capacity; Random maintenance time; Random lead time; PREVENTIVE MAINTENANCE; SYSTEMS;
D O I
10.2991/978-94-6239-180-2_34
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A joint strategy, referred to as periodical condition-based repair-by-replacement and continuous reviewed (S, s) type spare provisioning policy, is presented for continuous deteriorating systems with a known number of identical repairable components. Maintenance consists of replacing all failed and/or deteriorated components, and then deteriorated components being repaired off-line. With assumptions of random repair time, random lead time for spare parts ordering and imperfect maintenance effect, a stochastic simulation model is developed to determine the jointly optimal strategy. The objective function of the model represents the average cost per component per unit time over an infinite time span, while inspection interval, preventive replacement threshold, spare part inventory levels and repair capacity are chosen as decision variables. The optimal result is obtained using integrating approach with discrete event simulation and genetic algorithm (GA). Simulation results indicate that there are trades-off among maintenance policy, spare parts inventory and repair capacity.
引用
收藏
页码:347 / 357
页数:11
相关论文
共 50 条
  • [41] Joint Optimization of Spare Part Supply and Opportunistic Condition-Based Maintenance for Onshore Wind Farms Considering Maintenance Route
    Zhu, Xiaoyan
    Wang, Jun
    Coit, David W.
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2024, 71 : 1086 - 1102
  • [42] Optimal replacement policy and inspection interval for condition-based maintenance
    Golmakani, Hamid Reza
    Fattahipour, Fahimeh
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (17) : 5153 - 5167
  • [43] A comparative study of time-based maintenance and condition-based maintenance for optimal choice of maintenance policy
    Kim, Jeongyun
    Ahn, Yongjun
    Yeo, Hwasoo
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2016, 12 (12) : 1525 - 1536
  • [44] Optimal replacement policy and the structure of software for condition-based maintenance
    Jardine, A.K.S.
    Banjevic, D.
    Makis, V.
    Journal of Quality in Maintenance Engineering, 1997, 3 (02): : 109 - 119
  • [45] Joint optimization of condition-based maintenance and condition-based reallocation for a system with multiple degrading components
    Wang, Jun
    Yang, Yating
    Fu, Yuqiang
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2024, 40 (01) : 339 - 361
  • [46] A shock model for the maintenance of systems and spare with random lead time
    Rangan A.
    Venkat D.T.
    Sarada Y.
    International Journal of Industrial and Systems Engineering, 2011, 7 (02) : 254 - 268
  • [47] A fixed interval ordering policy for joint optimization of age replacement and spare part provisioning
    Kabir, ABMZ
    Farrash, SHA
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1997, 28 (12) : 1299 - 1309
  • [48] Optimal Condition-based Opportunistic Maintenance and Spare Parts Provisioning for a Two-unit System using a State Space Partitioning Approach
    Zhang, Xiaohong
    Liao, Haitao
    Zeng, Jianchao
    Shi, Guannan
    Zhao, Bing
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2021, 209
  • [49] A new inspection heuristic for a condition-based maintenance policy in a spare part returns context
    Boudhar, H.
    Dahane, M.
    Rezg, N.
    2013 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC 2013), 2013, : 1300 - 1305
  • [50] Joint optimization of preventive replacement and periodic review spare part provisioning policy with used items
    Zhang, J
    Tian, ZG
    Li, XH
    Zuo, MJ
    PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2: INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT IN THE GLOBAL ECONOMY, 2005, : 878 - 882