Joint Optimization of Condition-Based Repair-by-Replacement and Spare Parts Provisioning Policy with Random Maintenance Time and Lead Time

被引:3
|
作者
Zhang, Xiao-hong [1 ]
Zeng, Jian-chao [1 ]
机构
[1] Taiyuan Univ Sci & Technol, Div Ind & Syst Engn, Taiyuan, Peoples R China
关键词
Joint optimization; Condition-based repair-by-replacement; (Ss) type spare provisioning policy; Repair capacity; Random maintenance time; Random lead time; PREVENTIVE MAINTENANCE; SYSTEMS;
D O I
10.2991/978-94-6239-180-2_34
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A joint strategy, referred to as periodical condition-based repair-by-replacement and continuous reviewed (S, s) type spare provisioning policy, is presented for continuous deteriorating systems with a known number of identical repairable components. Maintenance consists of replacing all failed and/or deteriorated components, and then deteriorated components being repaired off-line. With assumptions of random repair time, random lead time for spare parts ordering and imperfect maintenance effect, a stochastic simulation model is developed to determine the jointly optimal strategy. The objective function of the model represents the average cost per component per unit time over an infinite time span, while inspection interval, preventive replacement threshold, spare part inventory levels and repair capacity are chosen as decision variables. The optimal result is obtained using integrating approach with discrete event simulation and genetic algorithm (GA). Simulation results indicate that there are trades-off among maintenance policy, spare parts inventory and repair capacity.
引用
收藏
页码:347 / 357
页数:11
相关论文
共 50 条
  • [21] Joint optimization of maintenance inspection and spare provisioning for aircraft deteriorating parts
    Jing Cai
    Xin Li
    Xi Chen
    Journal of Systems Engineering and Electronics, 2017, 28 (06) : 1133 - 1140
  • [22] Joint optimization of maintenance inspection and spare provisioning for aircraft deteriorating parts
    Cai, Jing
    Li, Xin
    Chen, Xi
    JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS, 2017, 28 (06) : 1133 - 1140
  • [23] Joint condition-based maintenance and spare provisioning policy for a K -out-of- N system with failures during inspection intervals
    Zheng, Meimei
    Lin, Jie
    Xia, Tangbin
    Liu, Yu
    Pan, Ershun
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 308 (03) : 1220 - 1232
  • [24] Joint optimization of monitoring quality and replacement decisions in condition-based maintenance
    Nguyen, Khanh T. P.
    Phuc Do
    Khac Tuan Huynh
    Berenguer, Christophe
    Grall, Antoine
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2019, 189 : 177 - 195
  • [25] Joint optimization of spare parts supply-demand for k/N(G) system under condition-based maintenance
    Yang J.
    Han M.
    Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2019, 41 (09): : 2148 - 2156
  • [26] Joint optimization of condition-based maintenance and condition-based production of a single equipment considering random yield and maintenance delay
    Zhang, Nan
    Cai, Kaiquan
    Deng, Yingjun
    Zhang, Jun
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2024, 241
  • [27] Joint decision making for condition-based maintenance and spare parts ordering of components based on vibration monitoring
    He Y.
    Wang H.
    Li J.
    Qi Y.
    Hangkong Xuebao/Acta Aeronautica et Astronautica Sinica, 2022, 43 (05):
  • [28] Joint Optimization in Condition-Based Maintenance and Inventory Policy for the Repairable System
    Deng, Huayang
    Shi, Quan
    Wang, Yadong
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [29] Condition-based critical level policy for spare parts inventory management
    Dendauw, Pieterjan
    Goeman, Thomas
    Claeys, Dieter
    De Turck, Koen
    Fiems, Dieter
    Bruneel, Herwig
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 157
  • [30] Joint optimization of condition-based maintenance and spare part inventory for two-component system
    Zhang, Xiao-Hong
    Zeng, Jian-Chao
    Gan, Jie
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2018, 35 (06) : 394 - 420